Many people want to move their handwashing stations out of the restroom, but what should be done bef

Updated on Bathroom 2024-05-24
8 answers
  1. Anonymous users2024-01-24

    Many people feel that it is too troublesome to put the handwashing station in the bathroom, because if the handwashing station is placed in the bathroom,If there are more people in our family, then getting up in the morning to wash is a very troublesome problem for everyone.

    If we put the sink outside the bathroom, we can improve the utilization rate of the restroom, we can use the toilet in the toilet, and we can wash in the sink, we can achieve the maximum separation of dry and wet. If there is a relatively free space outside the bathroom, then this design is still worth advocating. But before we can move the sink out of the restroom, we need to do some preparations.

    The first job is waterproofing and drainage, there will be a lot of water near the sink, in order to prevent splashing on the wall and causing the latex paint to crack, or the wallpaper from moldy, we must get a good waterproof layer. The range of the waterproof layer is about the ground directly below the sink, and it extends to about a meter above the wall it relies on.

    In addition, drainage is also very critical, because there is no drain pipe outside the bathroom, so we must pull a pipe in advance before moving the sink out, so that the sink can drain smoothly. There isn't much slope outside the bathroom, so the sink doesn't need a floor drain, and even if you have one, it's useless.

  2. Anonymous users2024-01-23

    Before you start, find a place to set up a handwashing station and check whether it is convenient to place.

  3. Anonymous users2024-01-22

    In fact, I think it's a little more convenient to do this.

  4. Anonymous users2024-01-21

    When the sink is removed from the bathroom, it must be waterproofed and drained.

  5. Anonymous users2024-01-20

    Check whether the waterproofing and drainage are suitable before starting work?

  6. Anonymous users2024-01-19

    Then you must do a good job of separating dry and wet, otherwise the water will come out.

  7. Anonymous users2024-01-18

    Waterproofing and drainage must be prepared in advance.

  8. Anonymous users2024-01-17

    The arrangement of water pipes should be done well in advance, and the separation of dry and wet should also be done.

Related questions
1 answers2024-05-24

First of all, it is necessary to determine what kind of thing you want, prepare materials for the washbasin faucet of Huanyang Sanitary Ware, about all copper, 250 yuan for the upper grade, a ceramic basin, 400 yuan for a good one, and 120 yuan for general. Divide the table on and off the counter basin, wash basin drain drain, about 70 yuan bathroom mirror, dozens of yuan a piece, and marble countertops Natural about 500 yuan a square meter Including processing costs. If it is on the ground, it is necessary to prepare cement porcelain tiles, and if it is not a floor-to-ceiling washbasin, a stainless steel bracket support panel will be welded, about dozens of yuan.

4 answers2024-05-24

Preferably on the side! According to the traditional Chinese architectural decoration habits, the front of the door is best wide!

6 answers2024-05-24

1. Marble. Using marble, granite is more durable and wear-resistant, beautiful and high-grade 2, granite. The use of marble, granite is more durable and wear-resistant, beautiful and high-grade 3, artificial stone. There are materials with high mildew and corrosion resistance. >>>More

6 answers2024-05-24

Usually the materials used for the toilet and handwashing station are: >>>More

2 answers2024-05-24

THE BATHROOM IS GENERALLY TILED TO THE CEILING 150MM HIGH, AND THE MINIMUM IS TO BE PASTED WITH METERS.