    Glad to answer one for you: take the tile knocked out and do waterproofing. Two: Do waterproofing on the roof downstairs, but the effect is relatively poor, and you can only brush it a few times. Three: Cut the tile joints, cut 10 cm into each seam, and then paint with JS flexible waterproof coating.

  2. Anonymous users2024-01-22

    Bathroom waterproofing, is to do on the cement base surface, not on the tile, is the need to do waterproofing before tiling, so there is no waterproofing on the bathroom tile to do waterproofing. Bathroom waterproofing, it is recommended to use mortar waterproofing agent to do, not only with the base surface paste firm but also puncture resistance, high strength, environmental protection and non-toxic construction is simple, waterproof years can also be the same life as the building, is now the preferred material for home improvement bathroom waterproofing!

  3. Anonymous users2024-01-21

    My home has just been renovated, the tiles are waterproof, pro before the tile is to do the ground waterproof, as long as this waterproof is done, do not stick the tile, it will not be watery.

  4. Anonymous users2024-01-20

    Bathroom waterproofing, is to do on the cement surface, not on the tile, is need to do waterproofing before tiling, so the size of the floor tile gap has nothing to do with waterproofing. Bathroom waterproofing, it is recommended to use mortar waterproofing agent to do, not only with the base surface paste firm and puncture resistance, high strength, environmental protection and non-toxic construction is simple, waterproof years can also be the same life as the building, is now the preferred material for home decoration waterproofing!

  5. Anonymous users2024-01-19

    Generally, there is no such thing as how to waterproof bathroom tiles, and the waterproofing of the bathroom is on the cement-based surface, and there will be no waterproof effect on the tiles.

    It is recommended to use mortar waterproofing agent for waterproofing in the bathroom, which is not only firm with the base surface, but also has high puncture resistance, can have the same life as the building, and is the preferred material for home decoration waterproofing.

    The specific construction method is as follows:

    1.Clean the construction base surface and sprinkle water to moisten, but there should be no stagnant water.

    2.The waterproofing agent and cement are stirred into plain mortar according to the ratio of 1:3, and the construction site is evenly and densely painted, with a thickness of about 2 mm.

    3.After waiting for 20 minutes for the plain mortar to dry, the waterproofing agent, cement, and sand are stirred into mortar according to the ratio of 1:2:6, and the construction can be smeared in an ordinary plastering way, with a thickness of about 10 mm each time, and the ground is smeared on both sides and the wall is smeared once.

    4.The construction is 20 hours and the water is sprinkled and maintained, and the direct sunlight needs to be covered!

  6. Anonymous users2024-01-18

    (1) The bathroom is waterproof, and the height of the surrounding walls needs to be ensured to be not less than 30 cm;

    2) If there is a shower, the height of the waterproof paint should not be less than 150 cm, preferably about 180 cm, on the installation of the shower faucet and the adjacent wall.

    3) After the waterproofing is done, the closed water test should be done. It is to put the water on the floor of the bathroom, so that the ground is completely submerged in water about 3 4 cm, and set a fixed elevation (horizontal plane); After 24 hours, if the water level is below the set elevation, it means that there is a water seepage problem on the ground, that is, the waterproofing is not done well. In this way, it is necessary to re-do the waterproofing.

    4) After the bathroom waterproof paint is brushed, tiles should be pasted on it, so cement-based waterproof materials should be used to paint. The advantage of cement-based waterproof material is that it can be bonded with the cement base layer, its adhesion is very good, and it will not shell after pasting the tile. Other (non-cementitious) waterproofing materials are prone to shelling, which can cause wall tiles to fall off.

    Suggestion: It is best to use the best waterproof material, after all, it is a long-term use, and it is very troublesome to redo, so you should get the best one at once.

  7. Anonymous users2024-01-17

    Paint two or three coats of waterproof paint on the wall and then apply tiles.

  8. Anonymous users2024-01-16

    It's not tile waterproofing, it's wall waterproofing, there is a water-draining coating, the ground is to the height of meters, it should be applied evenly, and there are conditions to do 3 sides.

  9. Anonymous users2024-01-15

    ºÜ¸10¹«·JSÈáÈ

Related questions
10 answers2024-05-02

If you're worried about water leakage, the most direct way is to test the water. If there is a water mark on the root of the pipe, it must be that he didn't wrap the pipe for you, or he didn't make it tight. If you want to paint yourself, you can buy some polyurethane, but you don't use much of that, and most of it is sold in barrels. >>>More

9 answers2024-05-02

Make your own waterproofing and brush polyurethane waterproof paint. >>>More

4 answers2024-05-02

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

2 answers2024-05-02

Step Method Do a good job in the maintenance of the car at the grassroots level Normally, the ground is a cement mortar surface, and there are some special circumstances, such as the pipeline is not buried, and the ground is uneven, so the base should be smooth, the surface should be smoothed and calendered, solid, and there should be no hollowing, sanding, cracking, etc., and the moisture content of the base should meet the construction requirements of waterproof materials, not more than 9%. The flooding slope of the screed should be 2%, and the slope of 5% (1 20) should be wiped out at the root of the pipe against the wall to avoid water accumulation here. Pipe roots and floor drains that protrude from the floor and walls. >>>More

4 answers2024-05-02

The bathroom is mostly made of JS, polyurethane, Jintang water does not leak, plugging king, South Korea Shuangxiong, Japan Daguan and other waterproof, and first difficult and then easy, first local and then large, that is, the wall root, pipe cage, pipe root, the root of the wall to do arc 20 diameter, the root of the pipe ascending 20 30mm and do caulking, and then full coating, two application direction vertical, dry area to 300mm high, wet area to do 1800 high. 24-hour water storage without leakage, and then do the waterproof protective layer, and then the surface layer is done, and the second water storage needs to be done for 24 hours without leakage, to be qualified.