-
Try not to change the water and electricity after the waterproofing, otherwise the new water and electricity slotting part should be redone waterproof.
Change the door, or find your favorite sticker to put on!
Talk about all the metal parts in the bathroom, (metal pipes, metal faucets, electric water heaters to metal shells, shower head mixing water valves, metal drains, floor drains, metal brackets, etc.) using metal strips (copper wires, stainless metal steel bars, etc.) and connect together, connected to the equipotential metal bus terminal, and then from the equipotential bus bar using a wire to connect to the equipotential metal bar of the protective grounding wire of the distribution box, the detection and blocking is not more than 4 ohms on the qualified ---
There is no need to change this, this toilet is brought by the master room, many master room toilets are in this location, or that place, that is in front of the toilet, flush with the bedroom, make a screen.
First do hydropower, then do waterproofing.
After the water and electricity are done, fill the gap between the floor and the water pipe, and then do the waterproofing. >>>More
If you want to get it through, you have to see if the wall on the left side of the bathroom is a load-bearing wall, if it is a load-bearing wall, then you can't remove it. If it's not a load-bearing wall, then you can get it through. >>>More