I hired someone to lay tiles, but the paving was not good, there was no leveling, and the bedroom wa

Updated on Bathroom 2024-05-23
6 answers
  1. Anonymous users2024-01-24

    The room is higher than the bathroom, the gap is large, it depends on whether the quality of the tiles is very poor, some bricks are mostly grade 2 bricks, the edge of the brick itself is not straight, paved, the gap is large. You should first rule out the cause.

    In the case that the bricks are good, the worker should be told how to lay the tiles before laying them. You have the right to know.

    On the contrary, there is a problem with communication. -- Deduction of workers' wages, not much money. The main thing is that the heart is uncomfortable. Use caulk to hook the crevices. Within 3mm, it is considered normal.

  2. Anonymous users2024-01-23

    It's right that people's tiles are higher than the bathroom! Do you want the bathroom to be higher than the bedroom and let the water pour in?

    How big is the gap at the foot of the wall, 1-3 mm is not to say anything.

  3. Anonymous users2024-01-22

    The room is naturally higher than the bathroom.

  4. Anonymous users2024-01-21

    The room should be higher than the bathroom, which will prevent water from the bathroom from flowing into the bedroom.

  5. Anonymous users2024-01-20

    1. Operating conditions.

    After the ground is leveled, do a good job of waterproofing the ground and waterproof protective layer.

    Do a good job of installing water and electricity pipelines, and plugging and smoothing scaffolding, eye and pipe holes.

    Basin frames, mirror cards, pipe cards, water tanks, gas, etc. should be buried with anti-corrosion wood bricks and accurate positions.

    Uniform pops up a +500mm horizontal line on the wall.

    The construction process is as follows:

    1) Clean up the base layer, clean up the mortar slag, dust, oil stains, etc. remaining in the base layer, and water and moisten it in advance.

    2) 12mm thick 1:3 cement mortar priming, priming should be layered, each layer thickness should be 5 7mm, and then smooth and rub the hair.

    3) Wait for the bottom layer to be ashed.

    When the sixth and seventh layers are dry, according to the requirements of the drawings, the specifications of the bricks and the actual conditions, the bricks are arranged and the elastic line is carried out.

    4) Use 1:3 cement mortar to stick the corner bricks on the ground as a reference point to control the surface flatness of the floor tiles.

    5) Bottom ruler, calculate the elevation of the lower mouth of the next brick accurately, the upper skin of the bottom ruler is generally 10mm lower than the ground, and put the bottom ruler on this basis, which should be horizontal and stable.

    6) Before the veneer brick, the face brick should be soaked in water for more than 2 hours, and then taken out to dry and set aside.

    7) Wipe the 8mm thick cement mixed mortar bonding layer, scrape flat, paste the surface brick with the wipe from top to bottom, require the mortar to be full, remove and repaste when the ash is lost, and check the flatness with a ruler at any time, and ensure that the width of the gap is consistent.

    8) After pasting after self-inspection without hollowing, unevenness and straightness, wipe it clean with cotton yarn, wipe the joints with white cement slurry or pat dry cement, wipe the plain slurry in the joints with a cloth, and wipe the brick surface clean.

  6. Anonymous users2024-01-19

    Is it correct that the home tile is higher than the bathroom?

    How big is the gap at the foot of the wall, 1-3 mm is not to say anything. Do you want the bathroom to be higher than the bedroom and let the water pour in?

Related questions
4 answers2024-05-23

There is no such technology yet!

You can choose warm tiles yellow, beige, you can do it! >>>More

3 answers2024-05-23

You can find a brand and talk about it, some brands can be distributed in the early stage.

2 answers2024-05-23

Living room tiles are diagonally paved in feng shui. The method of laying floor tiles with the diagonal paving method is as follows: >>>More

3 answers2024-05-23

Do waterproofing needs to be done on the surface of the water, dig excellent permeability crystalline waterproofing, you can do it yourself on the cement surface with a super permeable waterproof guard (if there are cracks and potholes on the cement surface, fill the complete with metin porcelain glue and then do waterproofing). >>>More

4 answers2024-05-23

My house is also covered with nature, and they come to maintain it once a year. You can go to the specialty store and buy the kind of oil that is used to mop the floor, the kind made in the United States. In the future, it is recommended to buy a composite one, which has a small seam.