What to pay attention to when re doing waterproofing in the bathroom

Updated on Bathroom 2024-05-11
1 answers
  1. Anonymous users2024-01-23

    For a while, find a professional to do waterproof construction, but to do a closed water test, to determine the waterproof effect before paving the floor and wall tiles.

Related questions
3 answers2024-05-11

1. The bathroom floor is leveled first. If you're replacing the floor tiles in the bathroom, be sure to level the floor with cement mortar before waterproofing it after chiseling off the original tiles. This avoids leakage of the waterproofing coating due to uneven thickness. >>>More

9 answers2024-05-11

It takes 3 to 4 days to re-do the waterproofing of the bathroom. >>>More

7 answers2024-05-11

The size of the area is different, the price gap between the different city locations is quite large! >>>More

1 answers2024-05-11

No need to knock bricks to do waterproofing.

To do waterproofing, you need to do it on the front of the water. >>>More

3 answers2024-05-11

It needs to be redone, because in the process of reinstalling the bathroom, the worker master will not guarantee that it will not destroy the waterproof layer that was done before, if you are on the first floor, you don't have to do it again, if it is not the first floor, it is recommended to redo it, because once the water leaks and has to be renovated, the loss caused is not a little bit, and the current waterproof is not too expensive.