Do it first? You mean waterproof? It is recommended to use flexible waterproofing, which is more durable and less prone to water leakage.
Rigid waterproof village material refers to cement, sand and gravel as raw materials, or a small amount of admixtures, polymers and other materials mixed in it. Through the method of inhibiting or reducing the porosity, changing the pore characteristics, and increasing the compactness of the interface of each raw material, the cement mortar concrete waterproof material with a certain anti-permeability is prepared. The rigid waterproof has a long service life, but due to its weight, the structural form is more limited, and it is easy to crack and seepage. >>>More
If you don't do waterproofing first, the gap between the partition and the ground will leak later, so be sure to do waterproofing first.
Waterproofing must be done before tiling.
The main reasons are: >>>More
Do waterproofing first. If conditions allow, it can be waterproofed twice. Because there are many toilet pipes and water facilities, it is inevitable that water leakage and seepage will occur. >>>More
The bathroom decoration should first do the water pipe arrangement, and then make the waterproof layer. According to the rules of the house decoration construction process, the entry of workers into the site is always the first step. If the waterproofing is completed first, then the subsequent construction arrangement of the water pipe, such as slotting and drilling, will inevitably damage the waterproof layer, thus forming a hidden danger of water leakage. >>>More