The bathroom is heated first or waterproofed first

Updated on Bathroom 2024-04-28
2 answers
  1. Anonymous users2024-01-23

    Do waterproofing first. If conditions allow, it can be waterproofed twice. Because there are many toilet pipes and water facilities, it is inevitable that water leakage and seepage will occur.

    Before laying floor heating, do a traditional waterproof measure, and then lay floor heating after waterproofing, which can prevent the phenomenon of floor heating water seepage. After the floor heating is paved, the waterproof test can be done again, which can form a protective layer of floor heating, reduce the damage of water to the floor heating, and thus improve the thermal effect of floor heating. Second, it can minimize the phenomenon of water leakage and water seepage in the bathroom.

    It also reduces the hassle of future repairs.

  2. Anonymous users2024-01-22

    Of course, it is waterproof first, because waterproofing is to prevent the water pipe from leaking to the next layer, including the floor heating pipe, so it is necessary to do waterproofing first and then lay the pipe.

Related questions
3 answers2024-04-28

The bathroom does not do underfloor heating, because.

The bathroom space is too small, and there are many pipes, so it is not easy to lay floor heating. >>>More

2 answers2024-04-28

Generally, the waterproofing of the bathroom is done after the floor heat is paved, and the water pipe should be sealed with cement when the floor heat is paved, including the water pipe of the bathroom. When collecting the house, you need to do the water test of the kitchen and bathroom, and the waterproof test can be divided into two times or three times when the bathroom is renovated, the first time the caisson floor is cleaned up and done once, and then after air drying, the second flooding slope is done, and then the third time is done after drying, and then filled with ceramsite after air drying, and then cement sand leveling, and then the bricks are paved.

1 answers2024-04-28

Make a waterproof layer first. Deal with the root of the chimney pipe and the root of the drainage pipe. These two are extremely critical points and are prone to water leakage.

1 answers2024-04-28

First make floor heating and then make tiles for kitchen and bathroom.

2 answers2024-04-28

If you don't do waterproofing first, the gap between the partition and the ground will leak later, so be sure to do waterproofing first.