About toilet waterproofing.

Updated on Bathroom 2024-05-17
11 answers
  1. Anonymous users2024-01-24

    Water-based is to add waterproofing liquid to the cement, and then wipe the floor of the bathroom as a whole, and then turn the wall up 15 centimeters, which is generally the case for waterproofing in the bathroom

  2. Anonymous users2024-01-23

    It's all the same, and it's recommended to use two-component polyurethane or good JS

  3. Anonymous users2024-01-22

    Oily. I also use my hairdresser's shampoo bed. Water-based pipes soon.

  4. Anonymous users2024-01-21

    Waterproofing grout can be done on the top of the downstairs, but it is more difficult to remediate the corners.

  5. Anonymous users2024-01-20

    There is no better way, because this is the only way to cure the symptoms and the root cause, although it is a little more troublesome.

  6. Anonymous users2024-01-19

    Only redoing is the fundamental solution.

    Everything else is a palliative rather than a cure.

  7. Anonymous users2024-01-18

    There is a "plugging king", which belongs to building materials, similar to cement-like powder, which is adjusted into dry mud with water and stained to the gap of water leakage.

    The specific situation should be analyzed to see where the leakage is, generally the waterproofing around the sewer pipe is not done, plus the sewer pipe passes through the floor, and the leakage, you need to clean the gap around the sewer pipe and expand the gap a little. First adjust a little bit of plugging leakage, seepage into the gap, and then use some dry stuff into the crack, it should be no problem, test a few times, see if there is still leakage, and test a few more gaps at the leakage point, because the water will seep under the ground rotation and form a transfer leakage point.

  8. Anonymous users2024-01-17

    Hello, this is a good one you can try.

  9. Anonymous users2024-01-16

    You first have to position and install the water and sewage pipes, and then use cement mortar to level the bathroom floor, and then brush the waterproof on it, and use JS waterproofing to do so.

    Remember, all pipe roots have to be brushed once, and then a large area should be brushed, which means that the pipe roots should be brushed at least twice. The general wall should be painted from the ground up at least 30 cm (the national standard is 10 cm, and the high-end Beijing landmark is 30 cm), and the height of the shower area should be at least one meter.

    Then put water on the floor of the bathroom after waterproof drying, do not less than 24 hours of closed water test, go to the downstairs room to see if there is a watermark on the top surface, leakage, if not, the waterproof is qualified, and then you must pay attention to protection, you can make a protective layer on it. Then it's time to apply the tiles.

    After pasting the tiles, it is best to do a second closed water test, just in case.

  10. Anonymous users2024-01-15

    My house is also a rural house, just stick the floor tiles, and then use sealant or structural adhesive to hook the joints. My house has no seams and no water. The key is that the water is drained in a timely manner.

    Whether it's JS or polyurethane, as long as there are cracks in the walls of your home for a long time, it won't work. So drainage is key. Conditionally, all vitrified bricks are used.

  11. Anonymous users2024-01-14

    The project upstairs before doing waterproofing is good. At the beginning, you should use glass water and cement (remember to be slightly thinner with the paste), first brush the root of the pipe and the corner of the wall, and then use polyurethane (preferably water-based) to brush two to three millimeters thick after drying, so as to keep the whole even. Anyway, it is best to paint all the walls of your own home, and it is best to paint 10 to 15 cm at the door to prevent overflow.

    Brush it twice! When brushing, pay attention to the brush several times, do not have trachoma (there is a trachoma, it may leak, hehe), after the ventilation conditions are good, it can be dried in 12 hours, and then do 24 hours of closed water experiment, if you are not at ease, two poops are OK. Finally, with a five-centimeter-thick protective layer, you can stick the floor tiles.

Related questions
3 answers2024-05-17

Seeing the problem upstairs, it must be a leak in the bathroom. >>>More

2 answers2024-05-17

We must not try to save trouble and cheap, if we do not do a good job, we will pay a greater price in the future. Generally, the leak plugging treasure is used to do the yin angle treatment, and then the ground is used with the brand of polyurethane waterproof coating, and then the closed water experiment is done. If there is no water leakage, you can make a cement protective layer on it. >>>More

2 answers2024-05-17

Sunken toilets need to be waterproofed once before backfilling, and it is recommended that it is best to use mortar waterproofing agent to do it, because it is stronger and more resistant to punctures, and it is not easy to be punctured when backfilling. >>>More

4 answers2024-05-17

The waterproof paint is brushed three times, and the bathroom wall should be brushed to a meter high. Brush the floor drain and drain around it several times, and do a 24-hour closed water test after doing it, and you can lay the floor tiles if there is no water leakage. If you paint part of the kitchen, you can paint around the floor drain if there is a floor drain, paint the meter height around the vegetable sink, if you want to paint all of them, the floor is also painted 3 times, and the wall can be painted 60 cm high.

7 answers2024-05-17

In your case, you can apply a penetrating waterproofing agent directly to the surface of the tile without compromising the waterproofing effect. >>>More