How to construct waterproofing in the bathroom Supplement The use of Goljia waterproof material is u

Updated on Bathroom 2024-05-07
1 answers
  1. Anonymous users2024-01-23

    Toilet waterproofing process.

    When the base surface is uneven, it needs to be repaired. Yin and yang corner areas, bends and other uneven needs to be leveled, as well as the removal of parts should be repaired and smoothed first, if there are cracks and seepage parts of the base, appropriate plugging methods should be used to repair first.

    2.Base surface treatment. The base surface layer must be intact and free of dust, remove thiopine particles, and the surface can be moistened with water before construction, but no open water can be left.

    3.Waterproofing slurry mixing. First open the strong waterproof slurry cover, take out a package of waterproof slurry and a bag of powder inside, slowly pour the waterproof slurry in, then pour the powder in, and stir it with an electric mixer until the slurry is uniform and particle-free.

    4.Started painting part of the wall with waterproofing slurry. First, the corners and deformed parts of the pipe are reinforced, and then a large area is applied.

    5.Waterproof painting order and tips. 1. First evenly paint the waterproof slurry on the wall to make it completely bonded to the wall, and the thickness of the coating film is about 1 mm or less, pay attention to avoid missing brushes.

    2. After the surface of the first layer of waterproof slurry is dry (about 2 hours after the hand touches the hands), use the same method to paint the second time in the staggered direction, at least 2 times, and 3 times for those with high waterproof requirements. (Thickness of waterproof coating film.)

    6. Start to apply the waterproof slurry on the ground. The only difference is that the waterproofing slurry is different, and the waterproofing treatment and painting method of the ground base surface is the same as the above steps.

Related questions
2 answers2024-05-07

Toilet waterproofing process.

When the base surface is uneven, it needs to be repaired. Yin and yang corner areas, bends and other uneven needs to be leveled, as well as the removal of parts should be repaired and smoothed first, if there are cracks and seepage parts of the base, appropriate plugging methods should be used to repair first. >>>More

1 answers2024-05-07

The flow of construction:

1.Reinforcement of the original waterproof layer of the bathroom and the first water test. >>>More

1 answers2024-05-07

Before laying the floor tiles, a layer of waterproof paint will be made on the ground, and after drying, water will be put in the bathroom, and it will be operated for a few days without leakage to paste the tiles.

7 answers2024-05-07

Construction Method: Section.

First, deal with the base surface (substrate) of the waterproof position. The base surface is treated into a firm, flat and clean surface, free of dust, greasy, wax and other debris substances; If there are pores, cracks and unequal defects on the base surface, it must be repaired and smoothed with cement mortar in advance, plastic strips are recommended to be pasted on the expansion joints, a layer of non-woven fabric must be added to the node, and the nozzle filling is recommended to use Leibangshi plugging king or nozzle grout; The corners of the wall should be plastered into an arc shape (or V-shaped); Make sure the base surface is sufficiently wet, but there is no open water; Second, pay attention to the waterproof construction in place. : Brush directly on the base surface with a brush or roller brush, the strength is used evenly, and the brush should not be missed; Generally, it needs to be brushed twice (according to the requirements of use), and the thickness of each brush should not exceed 1mm; After the previous one is slightly dry, the next one is brushed (just non-sticky, generally at an interval of 1-2 hours), and the front and rear vertical cross brushing, the total thickness of the brush is generally 1-2mm; If the coating has already cured, moisten it with water first when applying another layer. >>>More

3 answers2024-05-07

The bathroom is waterproof, and the surrounding walls need to be painted at a height of not less than 30 cm.