It is better to install floor tiles or water retaining strips in the bathroom first

Updated on Bathroom 2024-05-28
5 answers
  1. Anonymous users2024-01-24

    The bathroom is installed with a water retaining strip or a floor tile first for this point Many owners have been here for a long time, so in the end, in the end, the first one, some people say that the floor is paved first, in the water retaining strip, this approach is not right, should be installed first water retaining strip and then paved floor tiles are the best! It is necessary to continue to adjust the size and fill the void with cement, and then lay the floor tiles. If there are special requirements, then the construction can be changed according to the different situations.

  2. Anonymous users2024-01-23

    Hello! After designing the position of the water retaining strip, put the water retaining strip in, adjust the size, directly fill the gap with cement, and then pave the floor tiles. If there are special requirements, then the construction can be changed according to the different situations.

  3. Anonymous users2024-01-22

    According to the specification, it should be prefabricated in the floor base layer of the water barrier, and then waterproof construction, the waterproof layer needs to be turned over the water barrier, and then the water barrier is installed on the water barrier, and finally the bricks are paved, so as to ensure that the water in the shower area will not seep out.

    But now most of the situation is that after the floor tiles are pasted, the water retaining strip is glued with glass glue, which can only block the water, and there will still be water seepage in the cement mortar bonding layer under the floor tiles.

  4. Anonymous users2024-01-21

    For this, many people are asking, should the floor tiles be laid or the water retaining strip should be installed first during the construction of the bathroom?

    After designing the position of the water retaining strip, put the water retaining strip in, adjust the size, directly fill the gap with cement, and then pave the floor tiles. If there are special requirements, then the construction can be changed according to the different situations.

    While the decoration is beautiful, practicality is more important, so as not to bury the inevitable hidden dangers. Usually includes: plastic water retaining strips, marble water retaining strips, granite water retaining strips, etc.

    Different materials have different benefits, plastic is more economical, light and durable, and is loved by the majority of decoration owners.

    Among them, the most suitable material is natural stone, and the building materials market can generally do the place where the stone is processed, but marble and granite are more expensive because of their precious materials, but their unique beauty and generous characteristics will also have many owners to choose. The water retaining strip is made of black stone at most, which looks elegant and noble, and the classic black with any color of floor tiles will not be too abrupt.

    Artificial stone is wear-resistant, not afraid of scratches, good heat resistance, durable, and has anti-corrosion, acid and alkali resistance, easy to clean, water odor and other functions, which is definitely good news for the bathroom. However, in terms of hardness, it is not as naturally hard as marble.

  5. Anonymous users2024-01-20

    Nowadays, the bathroom is generally dry and wet separation, so everyone will use a water retaining strip to divide, many people do not understand whether the water retaining strip is before the installation of floor tiles or after the installation of floor tiles, today I will take you to find out.

    1. Install a water retaining strip after the floor tile is paved

    After the floor tile is pasted, then install the water retaining strip in the appropriate place, such an operation is to install the water retaining strip on the floor tile, between the waterproof strip and the floor tile is to use glass glue to glue well, so that the operation is theoretically possible, but it is generally not recommended, first of all, the waterproof strip is installed on the tile, not only affects the appearance, makes the waterproof strip higher than the ground a large section, secondly, because it is used to use glass glue for pasting, after a long time, it will cause the viscosity is not enough, and it is necessary to make up the glue frequently, so that it is easy to seep water, and it is more troublesome to operate.

    2. Install a water retaining strip before the floor tile is paved

    First use bricks to build out the style of the water retaining strip, and then pave the floor tiles, the water retaining effect of this method is better, the practicability is stronger, and the only disadvantage is that the style of the water retaining strip is relatively single.

    3. It can be installed before and after

    It is to reserve the position of the water retaining strip first, which can be installed before the brick, or the water retaining strip can be installed after the brick, and the glue is fixed after installation, and the waterproof between the gaps of the water retaining strip is done.

    Therefore, there are many ways to install water retaining strips, and you can set them according to the actual situation in your homeHowever, in general, it is recommended to do a good job of waterproofing first, install the water retaining strip, and then lay the tiles, so that the water retaining strip and the tile can be better connected, and the water retaining strip will not be too high above the ground, which is practical and does not affect the appearance.

Related questions
4 answers2024-05-28

According to the specification, it should be prefabricated in the floor base layer of the water barrier, and then waterproof construction, the waterproof layer needs to be turned over the water barrier, and then the water barrier is installed on the water barrier, and finally the bricks are paved, so as to ensure that the water in the shower area will not seep out. >>>More

2 answers2024-05-28

It is best not to install water retaining strips, find a good slope around the slope to the direction of the floor drain, and the water will flow away smoothly, do not pave the ground too horizontally, and it is not easy to clean up in the future

2 answers2024-05-28

Do waterproofing first. Then lay the floor tiles.

3 answers2024-05-28

Bathroom water retaining strip installation method.

1. When laying floor tiles, leave a groove, and after the cement mortar has been paved, put in the marble water retaining strip. >>>More