If there is no water supply in the bathroom and no toilet, can the commercial housing be delivered?

Updated on Bathroom 2024-05-12
3 answers
  1. Anonymous users2024-01-23

    Delivery standards written in accordance with the contract.

  2. Anonymous users2024-01-22

    If the developer does not follow the construction drawings and it is a private change to cut corners to save costs, you can report to the quality supervision department to protect their rights and interests.

  3. Anonymous users2024-01-21

    Generally, when the rough house is delivered, the water pipe enters the house. There may be a faucet in the kitchen, or a faucet in the bathroom, anyway, which is the shortest distance from the door to install a simple faucet, generally there is no toilet, but some developers will give an installation a very poor quality barely usable.

Related questions
1 answers2024-05-12

Whoever constructs is responsible. Tube for 5 years. 1. If the root of the pipeline is connected to the concrete slab, use the plugging king to plug it. 2. If the roof cracks leaks, it can be grouting at high pressure, or it can be treated with brick-free waterproof materials.

2 answers2024-05-12

The state stipulates that the bearing capacity of civil housing slabs is 200 kilograms per square meter, and 200 kilograms per square meter refers to the live load, which generally refers to the load of personnel, furniture, sundries, etc., and the position and size often change. Generally, the load that does not change once the construction is completed, such as the self-weight of the plate, the upper and lower plastering, etc., is called the fixed load. Because under normal circumstances, the room will not be covered with 200 kilograms per square meter, and when the local area exceeds 200 kilograms, other parts near the slab that have no load or less load will bear some on their behalf, so the floor slab will not be crushed. >>>More

1 answers2024-05-12

Leaking water in the bathroom is a very annoying situation, especially in a renovated house, and it is really a headache to leak again. If you pry the floor tiles open and repair them, it will take several days. >>>More

1 answers2024-05-12

The easiest way is to use a horizontal tube to make 50 lines and flip down.

3 answers2024-05-12

The developer will definitely have drawings to build such a tall building, and some of the drawings will be done, especially the drainage pipe ventilation pipe, if he doesn't do it, he won't save much money, but it will be very troublesome to rework it if it is found out, so this will definitely be done.