What to do with water seepage in the main pipe joint of the toilet

Updated on Toilets 2024-05-11
2 answers
  1. Anonymous users2024-01-23

    First of all, quickly notify the property management office to come and check, and then repair according to the actual situation, according to what pipe is in the maintenance process, if it is the drainage and sewage supervisor of the bathroom and kitchen, make an appointment for the maintenance time, and notify all the owners of the same house upstairs in advance, so that they can temporarily stop using it for a period of time during that period of time for emergency maintenance. The division of responsibilities is based on the actual situation, if it is a problem caused by the decoration company during the construction process, then it can be proposed to let the decoration company carry out all the maintenance costs, if it is a natural crack in the main pipeline, it is the problem of the original building, and the property management office mainly carries out the maintenance work.

  2. Anonymous users2024-01-22

    Change the valve, there is no good way.

Related questions
2 answers2024-05-11

Broken pipes or fittings in your home are not properly connected.

7 answers2024-05-11

Stop using water, wipe the water seepage clean, buy a PVC water pipe solution glue, apply it to the water seepage of the interface, and apply it again after it is dry, which can solve the water seepage problem.

2 answers2024-05-11

If there is no such testing agency in the local area, then you can only contact your community property with your upstairs owner to overhaul and replace the pipe. Even if it is repaired, it must be waterproof upstairs, and it is inevitable that there will be water seepage on the floor if you don't live for a long time!

2 answers2024-05-11

Temporary remedies can be made using punch cards, or the kind of bandages used to plug leaks.

7 answers2024-05-11

1. Redo waterproofing: Redoing waterproofing means that the floor tiles must be re-paved, and the original tiles should be removed and the base surface should be cleaned. After the cement mortar is proportioned, the ground is leveled and further waterproofed. >>>More