Which step is missing from the ceiling, and it will crack in less than 1 month?

Updated on Suspended ceilings 2024-04-25
4 answers
  1. Anonymous users2024-01-23

    First, the ceiling must be used as much as possible to use the whole page, otherwise it is easy to crack.

    Second, the spacing of the ceiling is too large, and the deformation of the keel is too large, which will also lead to easy cracking

    There is also if the elevation of the ceiling is not accurate or the elastic line is not clear, the local elevation is wrong, and the moisture content of the ceiling of the wooden keel is too high, and the phenomenon of deformation will also occur. Therefore, you must do your homework when making the ceiling, and the troubles in the later stage will make you annoyed.

  2. Anonymous users2024-01-22

    One less step in the ceiling will crack in less than a month, that is, there is no caulking tape at the joints of the gypsum board in the ceiling, and it will soon crack even if it is scraped with putty and painted in the later stage.

  3. Anonymous users2024-01-21

    After the installation of the keel is completed, don't be in a hurry to add gypsum board, you must first correct the flatness of the keel, make sure that it has been installed firmly, if you do less than this step will crack in less than 1 month.

  4. Anonymous users2024-01-20

    It is best to choose a whole piece of ceiling, not to put it together. The order of installing the ceiling is to measure the pay-off, fix the boom, install the side keel, install the main keel, install the secondary keel, install the decorative panel, and install the closing strip.

Related questions
1 answers2024-04-25

The grease trap is a filter tank set up in the sewage system with public canteens, restaurants, etc. approved by the plan according to environmental protection requirements. >>>More

4 answers2024-04-25

It is generally installed after the completion of the wall and floor tiles (at the time of finishing works). This is the best way to protect the finished product and is also the usual installer. >>>More

4 answers2024-04-25

Looking for a relationship is not a big thing, start small, accumulate a lot, accumulate business volume to run decoration companies, construction sites, hotels, actual companies, etc. Leave your business card, and your product information, generally a week will have customers to contact you.

8 answers2024-04-25

Before construction, it is necessary to ensure that the dry waterproof coating of the ground should be coated, without any omission and the base layer should be firmly combined, no cracks, no bubbles, no falling off The height of the painting is consistent, and the thickness should meet the requirements of the product regulations.

2 answers2024-04-25

It's very simple: The first step is to clean the floor first, and then operate according to the waterproof instructions you use, do the first time, preferably after 24 hours, and then do the second time, after 48 hours, plug the floor drain and fill it with water, and the next day to see if your downstairs residents' bathrooms are not leaking.