Whether the kitchen is installed with cabinets or a range hood first

Updated on Kitchen 2024-04-05
2 answers
  1. Anonymous users2024-01-23

    If you install an integrated stove, you will install the integrated stove first.

  2. Anonymous users2024-01-22

    To renovate a kitchen, you need to make cabinets first, and then install a range hood according to the height of the stove and pot.

Related questions
11 answers2024-04-05

When you take the room, you can let the cabinets do the initial amount, help you drain the water and electricity, and then you first finish the kitchen bricklayer, and then find the cabinet maker to do a finer measurement to determine the specific size, as for the ceiling, it is better to install it first, in fact, the impact is not big, custom cabinets are about a month cycle, you can take advantage of this time to do a good job in the kitchen bricklayer decoration.

3 answers2024-04-05

It doesn't really matter, as long as you get the size right. It is generally recommended to install the wall cabinet first.

3 answers2024-04-05

Generally, the kitchen decoration is to make cabinets first, and then install a range hood according to the height of the stove and pot. >>>More

1 answers2024-04-05

"Install the cabinets first, then install the interior doors", this is the generally accepted installation sequence.

13 answers2024-04-05

To renovate a kitchen, you need to make cabinets first, and then install a range hood according to the height of the stove and pot. The hood must be directly fixed on the wall, and the formal installation method of the range hood is to use expansion bolts to horizontally fix the range hood on the concrete or brick wall wall, not directly on the non-load-bearing wall wall, let alone on the cabinet.