Whether to install a range hood or cabinets in the kitchen first

Updated on Kitchen 2024-01-28
3 answers
  1. Anonymous users2024-01-23

    Generally, the kitchen decoration is to make cabinets first, and then install a range hood according to the height of the stove and pot.

    Because the range hood must be directly fixed to the wall, the formal installation method of the range hood is to use expansion bolts to horizontally fix the range hood on the concrete or brick wall wall, not directly on the non-load-bearing wall wall, let alone on the cabinet. The range hood that has been fixed to the cabinet must be removed and reinstalled. In addition, when installing the expansion pipe, the pipe hole and the drilling hole must be closely matched, and it is strictly forbidden to loosen the expansion pipe if the drilling hole is too large, causing the machine to fall; When the range hood needs to be installed separately, the stop plate in the included accessories must be installed in place to prevent the machine from falling off.

    A plastic bag is taped underneath to hold the pellets that hit the wall to prevent them from falling and getting on the countertop. The general installation process is as follows:

    1., drill 3-10 holes in the wall to a depth of 50-55mm, bury 10 plastic expansion tubes, and then fasten the hooks (attachments) with wood screws.

    2.Insert the smoke extraction hose into the check valve assembly and tighten it with self-tapping screws.

    3.After the whole machine is lifted, the two rectangular holes on the back wall can be aligned with the hook and hung up, and then the smoke exhaust hose is led out of the room, paying attention to the outlet of the smoke exhaust hose should be lower than the room.

    4.Install an M5x25 screw in the screw hole in the middle of the baffle and tighten it to prevent the hood from slipping off, and the installation is complete.

    Hope the above is helpful to you.

  2. Anonymous users2024-01-22

    It is best to install cabinets and hoods at the same time, if it is not convenient, you should first go to the electrical market to choose a good smoker, according to the size of the smoker, the cabinet manufacturer should leave a flue, dig the countertop where the stove is placed, and punch holes in the countertop (for the entry and exit of gas pipelines).

  3. Anonymous users2024-01-21

    When we decorate, we install the cabinet first, and finally install the pumping unit, but if you make cabinets on site, you can buy the pumping unit back first, and then make a hole behind the back panel of the cabinet according to the location of the pumping unit, so that it is convenient to install the pumping unit after the cabinet installation is completed.

Related questions
7 answers2024-01-28

Kitchen decoration, first of all, the ceiling is located at the top of the room, after the installation of the ceiling will not affect other work, and then the second step is to install the cabinet, after the installation of the cabinet, you can determine where the range hood is placed in the appropriate position, and the cabinet should be customized earlier, because the cabinet customization time will be longer. After the cabinet is installed, it is a matter of buying a range hood and installing a range hood.

13 answers2024-01-28

To renovate a kitchen, you need to make cabinets first, and then install a range hood according to the height of the stove and pot. The hood must be directly fixed on the wall, and the formal installation method of the range hood is to use expansion bolts to horizontally fix the range hood on the concrete or brick wall wall, not directly on the non-load-bearing wall wall, let alone on the cabinet.

13 answers2024-01-28

Kitchen decoration, is it the ceiling or the cabinets first? You'll understand after reading it! >>>More

8 answers2024-01-28

For the decoration of the kitchen, it is usually the reason why the ceiling is installed first, and then measured by the designer after the ceiling is installed, and then the cabinet is installed after the size is determined. >>>More

11 answers2024-01-28

When you take the room, you can let the cabinets do the initial amount, help you drain the water and electricity, and then you first finish the kitchen bricklayer, and then find the cabinet maker to do a finer measurement to determine the specific size, as for the ceiling, it is better to install it first, in fact, the impact is not big, custom cabinets are about a month cycle, you can take advantage of this time to do a good job in the kitchen bricklayer decoration.