How to deal with the leakage of the bathroom drainage pipe through the wall

Updated on Bathroom 2024-04-23
1 answers
  1. Anonymous users2024-01-23

    1. The water stop ring must be welded through the wall (ground) pipe, and the weld should be sealed without gaps in the full welding, and the inspection of the weld at the water stop ring should be strengthened.

    2. When the structural deformation or pipeline expansion and contraction amount is small, the fixed waterproof treatment method for the wall pipe can be directly embedded in the concrete by the main pipe.

    3. If the structural deformation or pipeline expansion and contraction amount is large (such as the heat pipe or there is a replacement requirement), the outer wall of the pipe with a limit of embedded wall pipe or embedded casing pipe should be welded with a flange of more than 10mm and 10mm, and double-sided full welding is required.

    4. When there are many pipelines through the wall, it is advisable to be relatively concentrated and adopt the method of the wall box.

    5. Paste the expanded water-stop strip, and scrub the outer surface of the embedded casing clean when using the water-stop strip for construction.

    6. The gap between the wall casing and the wall pipe is filled with sealing paste, the thickness should be sufficient, and it is strictly forbidden to seal it with ordinary cement mortar.

    7. If the bolts used to fix the formwork must pass through the waterproof concrete structure, the waterproof ring should be welded on the bolt or casing. The water-stop ring must be fully welded, and the number of rings should be determined by the design.

    8. The welding parts of the embedded parts should be fully welded tightly, the rust should be removed before burial, and the fixation should be firm when buried, and the protection should be strengthened after burial, and no collision and vibration should be allowed. In order to make the embedded parts stable, the embedded fixing frame method can be adopted.

Related questions
2 answers2024-04-23

The bathroom generally wants to be simple and beautiful, I. >>>More

1 answers2024-04-23

1 Make a hole in the floor slab.

2. Before the installation of the drainage pipeline, the civil engineering negotiation shall be required to pay off, find the size of the dump of sanitary appliances and the height of the rejection, install the trunk pipe, the riser pipe to the branch pipe in turn, and verify whether the coordinates are accurate again before the civil engineering plugging the floor hole. >>>More

2 answers2024-04-23

Bathroom copy main pipe leakage this.

Whoever is responsible for the attack must first confirm what is the cause of the water leakage in the main pipeline. If it is because of the water leakage caused by the decoration, it is the responsibility of the decoration company, if it is not caused by the decoration company, it is the responsibility of the property. >>>More

1 answers2024-04-23

Different regions, labor costs are different, market prices are also different, I suggest you go to the regional question

1 answers2024-04-23

The decoration of the bathroom is generally the same as that of the rest of our rooms, but due to the peculiarities of its function, we need to strengthen it in some aspects. The special function of the toilet gives it high requirements in terms of waterproofing, anti-odor, ventilation and anti-slip. And these requirements are the key considerations we need to consider when installing the drain in the bathroom. >>>More