The first ceiling or the first wire, it s the storefront!

Updated on Suspended ceilings 2024-04-24
2 answers
  1. Anonymous users2024-01-23

    Generally, it is the first line equipment, and the rear ceiling is more suitable, otherwise it is also broken through the top of the line, of course, the conditions are also allowed to be carried out at the same time or interspersed with construction, which is also very common, and it requires close cooperation with the workers.

  2. Anonymous users2024-01-22

    Either way. If time is tight, they can be built together.

Related questions
3 answers2024-04-24

Install the smoke pipe of the smoke machine first, then the ceiling, and finally install the cabinet smoke machine!

1 answers2024-04-24

Make a ceiling keel first.

Re-discharge the wire. Finally, the ceiling plate is laid. >>>More

9 answers2024-04-24

It must be suspended first, and the cabinets must be installed after the wall tiles are pasted - this is the general procedure for decoration construction. Otherwise, it will not only affect the construction of the ceiling, but also may damage the cabinets, and there will be a lot of dust、、、 when the painter is about to finish, it is not too late to install the cabinets.

1 answers2024-04-24

There is a period of time for the license to be approved, it is recommended to apply for the license first, and the location of the restaurant is also very important, it is recommended that you refer to the method of KFC, not if you think it is good.

2 answers2024-04-24

According to the specific situation, the gas water heater should be installed last. >>>More