The toilet was changed to a squat, is it complicated How much does it cost

Updated on Toilet 2024-04-09
6 answers
  1. Anonymous users2024-01-23

    It's not complicated, 400 is enough for the work, and it's enough for one day if it's smooth.

  2. Anonymous users2024-01-22

    It is very troublesome to change to squat, first of all, the sewer hole spacing is not the same, the key is to change the squatting to increase the ground, it is estimated that it will be at least 3000 yuan (if it is not a building or the first floor will be much more convenient, but it is estimated to be about 1000 yuan.)

  3. Anonymous users2024-01-21

    It is the problem of pit distance, if it is the bathroom of the building, pay attention to waterproofing.

  4. Anonymous users2024-01-20

    Breaking the ground, it should not be very difficult to change the pit distance, mainly to do waterproofing, all down to 600 yuan can do very well!

  5. Anonymous users2024-01-19

    It's not complicated. 100-200

  6. Anonymous users2024-01-18

    That's just 3...500 bucks.

Related questions
3 answers2024-04-09

Remove the toilet, pad the floor, and install the squatting pit.

7 answers2024-04-09

Dig a pit according to the size of the squat toilet and connect it with sand and cement. >>>More

3 answers2024-04-09

The toilet is changed to a squatting toilet, and the sewer pipe will be increased to the water trap, if you live on the first floor, you can also change, if you live upstairs, it will hinder the interests of the downstairs, it is difficult to talk about it.

3 answers2024-04-09

What kind of stagnant water, if it is water in the tank, then it is easy to do, open the lid of the toilet, the blue shell on the left that can float moves downward, so that the floating does not need a lot of water, you can adjust it, change it to a cheap 100 yuan or so, labor costs range from 100-500, look at the place, buy a life guide newspaper and call to ask.

2 answers2024-04-09

The squat toilet is changed to a flush toilet, and if the waterproof is not burned after the change, it will cause water leakage downstairs. To change the rock movement, it is necessary to know that Duan Yu needs to change the water pipe, to raise the water pipe to the plane level of the floor tiles, to open the ground for maintenance, and to do a good job of waterproofing around the pipe again.