-
This doesn't matter, when doing waterproofing, whether to open or not has little impact on waterproofing, but has a great impact on paving tiles, it is best to open half or not open when laying floor tiles. Otherwise, the cement will be dehydrated prematurely and will affect the firmness.
Make a waterproof mortar on the surface layer, or brush a layer of acrylic (a new waterproof material, similar to paint, with a good waterproof effect) on top of the normal work.
After the geothermal pipe is laid and tested for pressure, it needs to be covered with fine debris such as ceramsite, and then plastered for protection, and then made a waterproof layer. Otherwise, there will be greater hidden dangers.
Bathroom asphalt waterproof layer in the construction, asphalt layer is not solidified in the case, or toxic, the main smell emitted, very choking, the construction personnel should do a good job of protection, after its solidification on the strength of the basic no problem, and then do the upper layer of the floor tiles. >>>More
Of course not, wax does not have any waterproof effect, it is recommended to use a special kitchen and bathroom waterproof slurry to do, so that the waterproof effect is more guaranteed, the following is a detailed construction method: >>>More
This is possible, but it is completely unnecessary and the waterproofing will be worse. The most appropriate way is to prepare for waterproofing before, which is more convenient and has a better waterproof effect, but after that, it will cost a lot of manpower and material resources to do waterproofing, and the original design of the bathroom will also be disrupted, so everyone does not recommend this practice. >>>More