Old fashioned hotel room with no toilet. Now I want to change it to a standard room, how to change i

Updated on Bathroom 2024-03-04
1 answers
  1. Anonymous users2024-01-23

    First of all, you must confirm whether your space is enough, if it is enough, it is nothing more than to redo the water and sewer pipes.

    At present, PPR hot melt is basically used for water supply, and PVC pipes can be used for water supply. The price should be decided according to the site, basically if you don't punch the hole and perforate, it will be about 15 yuan per meter.

Related questions
1 answers2024-03-04

The overall atmosphere of the hotel is simple and elegant, the residential room wants to change the hotel first of all, the house should be enough, the style should be relatively unified, and whether you want to do a business hotel or an ordinary hotel, go to the modern hotel to do better to examine. If the toilet needs to be changed to water or water, the action may be relatively large.

2 answers2024-03-04

One small step forward, one giant leap for civilization.

1 answers2024-03-04

If there is space for a shower room, you can do it, but if you don't, you can't do it.

1 answers2024-03-04

Demolition and modification of bathroom decoration price: If a bathroom needs to be demolished and modified, it will be necessary to bear part of the demolition and renovation costs. Now the labor cost is already high, and the cost of demolition + removal + material transportation is about 3,000 yuan. >>>More

3 answers2024-03-04

That's for sure, the underground water inlet pipes and drainage pipes have to be re-installed, and some floor tiles and wall tiles have to be knocked out.