What is the waterproofing of the kitchen and bathroom made of? Is it paint or a tarp?

Updated on Kitchen 2024-03-22
3 answers
  1. Anonymous users2024-01-23

    Kitchen and bathroom waterproofing:

    Cement mortar waterproofing material.

    This is a common toilet coating, which should be used only when it is mixed with cement mortar in a certain proportion to form a uniform liquid. When batching, use a stirrer to stir, slowly add powder during the stirring process, mix and stir (you can add an appropriate amount of water to adjust the viscosity, but it is best to add water before adding powder), fully stir and disperse until there is no powder ball and no precipitation, and the prepared material should be used up within 2-3 hours.

    2. Polymer polymer waterproof materials.

    Polymer polymer waterproof materials are synthesized from a variety of water-based polymers, such as high-quality cement mixed with various additives, which belongs to a kind of polymer polymer waterproof materials. The flexibility of the polymer is combined with the rigidity of the cement, making it impermeable and stable. Its advantages are convenient construction, low cost, cost-saving and environmentally friendly.

    3. Acrylic toilet waterproof material.

    The biggest advantage of acrylic waterproof coating is that when the coating is finished, the coating will form a conjuncture, which has strong elasticity and ductility, and is very suitable for use as a waterproof material for toilets. It can also be applied on the wet base layer, with high bond strength, firm combination with the base layer and the outer protective decorative layer, no pollution and no peculiar smell, green and environmental protection.

  2. Anonymous users2024-01-22

    When is the right time to do kitchen and bathroom waterproofing?

    After the completion of the renovation of the water and electricity pipelines, the ground can be cleaned up, as much as possible to brush the pipe mouth several times on the brush, after the waterproof dry can be released, must be 48H after the inspection of the downstairs whether there is water seepage and leakage, waterproof is not a sloppy thing, otherwise the tile is very troublesome.

    How to do kitchen bathroom waterproofing?

    1. Precautions for waterproofing in the bathroom.

    Do not destroy the original waterproof layer when hydropower transformation, generally speaking, as long as the new house received by the decoration owner is qualified for quality inspection, it has been made waterproof layer, but many decoration owners will transform the layout of the bathroom and the water and sewage pipelines when carrying out hydropower transformation, so consumers must emphasize to the decoration workers not to destroy the original waterproof layer when supervising the construction, if the original waterproof layer is destroyed as a last resort, it must be repaired in time, and even redo the waterproof project to ensure that there will be no leakage.

    2. Choose the right waterproof material.

    1 Before the kitchen is renovated, it is necessary to carefully check whether there is any leakage in the kitchen on the upper floor, and if there is, the waterproofing project upstairs should be done before decoration.

    2 When the kitchen is renovated, if the original wall and floor tiles are removed and redecorated, regardless of whether the original waterproof layer has been made, the waterproof layer should be redone before re-pasting the wall and floor tiles, and the surrounding side walls are waterproof 200mm, and there is a bathtub part, and the waterproof layer should be able to spray the shower.

    3. Waterproof treatment when the kitchen is not decorated: if the waterproof layer is not made before, the waterproof layer will be added according to the above method; If the waterproof layer has been made, it should be carefully checked to see whether the waterproof layer is in place and whether it is damaged, otherwise it should be repaired. After the repair, the water injection test is based on the fact that there is no leakage and no moisture on the walls downstairs and around the building.

  3. Anonymous users2024-01-21

    Bathroom waterproofing is generally brushed Wanshibo kitchen and bathroom waterproof treasure or K11 waterproof coating, and it is more convenient to have waterproof coating construction.

Related questions
9 answers2024-03-22

Waterproofing should be brushed with waterproof paint first. >>>More

25 answers2024-03-22

There are usually two main methods when it comes to waterproofing the spine of the bathroom: waterproof coatings and tarpaulins. >>>More

11 answers2024-03-22

After the wall is renovated, the water and electricity have also been changed, and the waterproofing of the kitchen and sanitation must be done before starting to tile.

3 answers2024-03-22

The well-known waterproof coating brand has Aili, which is an imported product from the United States, which has no peculiar smell and can effectively remove the peculiar smell in the bathroom, antibacterial and mildew-proof, so that the interior can be kept bright and white for a long time. Because there are many water stains in the bathroom, and the air is not well dredged and humid, you can make a mortar waterproofing agent protective layer to increase the strength of the wall and improve the puncture resistance.

7 answers2024-03-22

If the bathroom waterproofing is not done well when decorating, it will bring great inconvenience to daily life in the future. So, do you know how to decorate the bathroom to be more waterproof? Today, I will share with you how to achieve real waterproofing when decorating the bathroom. >>>More