How to make a partition in the bathroom Before or after laying floor tiles

Updated on Bathroom 2024-03-02
6 answers
  1. Anonymous users2024-01-23

    The partition of the bathroom should be constructed masonry according to the design drawings for the installation layout of the bathroom sanitary ware at the beginning of the decoration. The width of the wall can be used as the thickness of the wall (with stucco and tiles), which is generally not more than 15 cm. It is not advisable to lay floor tiles first and then build partitions.

  2. Anonymous users2024-01-22

    Brother, look at what material is made of partition, if it is made of moisture-proof board, anti-compact board, etc., first pave the floor tiles, do a good job of the ceiling, bury the water pipe after the sanitary partition is the last installation, if it is built with red bricks or something, it can be fine before and after.

  3. Anonymous users2024-01-21

    What kind of partition are you talking about? If it is a shower room partition, it is generally to divide the shower room area from the tiles of the other dry areas, leave an 8 cm groove, and leave a marble water retaining strip for installation! Note the slope of the two areas, one towards the drain in each area.

  4. Anonymous users2024-01-20

    After the floor tiles and wall tiles are done, make a partition. Otherwise, the place of the aluminum profile will leak. Professionals with many years of experience.

  5. Anonymous users2024-01-19

    Of course, the water retaining strip of the partition is laid at the same time when the floor tiles are laid. The ceiling can be installed after it is finished.

  6. Anonymous users2024-01-18

    Before laying the floor tiles, make a stone foundation, and of course, there is also a way to make FRP mats.

Related questions
6 answers2024-03-02

When cutting the sewer pipe, you need to leave the thickness of the layup.

1 answers2024-03-02

1 water pipe, electricity, sewer pipe, should go well. It's okay if you don't do waterproofing, as long as the tiles on it are well pasted and the tile gaps are hooked, this is super waterproof. >>>More

3 answers2024-03-02

First the wall, then the ground. Because there is a floor drain in the bathroom, if you want to do the slope, you should do the ground first, and the wall tiles will not be flat.

5 answers2024-03-02

If the water is closed normally, it may be that the force is too strong when the tiles are pasted, which destroys the waterproof layer. It is recommended to find a waterproof person who did it at that time to solve it again.

4 answers2024-03-02

According to the specification, it should be prefabricated in the floor base layer of the water barrier, and then waterproof construction, the waterproof layer needs to be turned over the water barrier, and then the water barrier is installed on the water barrier, and finally the bricks are paved, so as to ensure that the water in the shower area will not seep out. >>>More