The floor is tiled in the house, and I want to install a bathroom

Updated on Bathroom 2024-03-30
1 answers
  1. Anonymous users2024-01-23

    It is best to wait for 2 days before going in, so that it is dry and solid, and pay attention to the protection of the finished product, if you need to do it on the roof pile and cement, please do it on the board.

Related questions
2 answers2024-03-30

The indoor ground is flat, and the feng shui is not very good. It indicates that the ditch is not smooth.

2 answers2024-03-30

This is caused by your failure to do a good job of waterproofing at the time. The bricks need to be pried open and redone.

1 answers2024-03-30

The space of the bathroom and kitchen is relatively dark, and the style and color of the floor tiles should be coordinated with the room as a whole, and the choice of floor tiles can be white or black. White can improve the brightness of the bathroom or kitchen, and black tiles with some patterns are also common, dirt-resistant and simple. If the room is too dark, try to choose white or some colors that can be brightened.

4 answers2024-03-30

If it is not easy to wash, you can wash it with dilute sulfuric acid, but pay attention to safety!

2 answers2024-03-30

If the pedal of the squatting toilet is wide, it is inconvenient to step on it, and there is a floor drain drainage, it can not be changed. If it is narrow, it needs to be tiled and widened, and if it must be drained from here, the entire ground is raised by bricks and sloped to the pit.