  1. Anonymous users2024-01-23

    Hello dear! Glad for your question! How to remedy the toilet waterproofing is not done

    If the waterproofing of the bathroom wall is not done, the row of tiles near the root of the wall need to be removed, and the waterproof should be re-pasted; If the bottom wall of the bathroom wall is not done, all the floor tiles need to be removed, and the waterproof layer should be paved and then tiled; If the bathroom drain pipe is damaged, you need to find the leaking drain pipe and replace it with a new one1, if it is a water pipe leakage, after the leakage area is clear, you need to remove the floor tiles first, and then find the leaking water pipe, re-dock the water pipe, and then seal it 2, if there is a crack in the water pipe itself, you need to replace the water pipe, and after treating the water pipe, you need to bury it, repair the waterproof layer within the range, and restore the floor tiles. 3. If the waterproof layer is leaking, it is necessary to remove the floor tiles, clean up the original waterproof layer, level the ground, and then further waterproof treatment. After the waterproofing project is done again, it is necessary to do the closed water test again, and the floor tiles can be laid only after passing the inspection.

  2. Anonymous users2024-01-22

    In the short term, it is possible to use bricks without smashing, and in the long term, it is recommended to turn over the bricks and redo them.

    Well, the waterproof coating should be cost-effective, relatively speaking, the brand cost performance in Guangzhou is good! However, the waterproof coating of bass is the most cost-effective.

  3. Anonymous users2024-01-21

    If the bathroom waterproofing is not done well, there may be many problems. First of all, friends will think of the phenomenon of water leakage, when there is a water leak in the bathroom, you need to find the point of water leakage, check whether it is a problem with the pipe, or a problem with the waterproof layer. If there is a problem with the waterproofing layer, you need to redo the waterproofing.

    01 However, it is also possible that there is a leak in the water pipe, such as a crack in the pipe. At this time, we first need to replace the pipes. In general, the problem of water leakage is relatively small, and the valve needs to be closed first, and then the leaking part is reconnected with a quick coupling.

    02 At the same time, it should be noted that PVC glue should be connected for pasting, and the main reason for this is to ensure that there is no more water leakage. After reconnecting the pipes into place, the leakage can be dealt with.

    03 Of course, if the waterproof layer fails, or when the waterproofing is done, the position is particularly low, then we need to re-lay the waterproof layer. First of all, it is necessary to choose a good quality waterproof material, clean the ground, and brush the waterproof material again, especially the sewer mouth.

    04 After the brush is completely dry, it will take about a day to perform the closed water test. The height and time of the closed water test must be carried out in strict accordance with the standard. If there is no water leakage, it means that the remedy is in place.

  4. Anonymous users2024-01-20

    The waterproofing of the bathroom is not done well, and it needs to be redone for waterproofing. First of all, all the floor tiles of the bathroom should be opened, and then tested with professional equipment, find the leakage point of the bathroom, and re-brush the bathroom floor with waterproof paste. After 24 hours of waterproof paste on the bathroom floor, you can fill the waterproof pool with water, and then wait for more than 48 hours to see if there is still water seepage around and downstairs.

  5. Anonymous users2024-01-19

    In the bathroom waterproofing project, there will be a scene where the bathroom waterproofing is not done, and many owners will be very anxious about what to do if the bathroom waterproofing is not done, because it is not only related to themselves but also affects the neighbors. Let's take a look at the solution to the toilet waterproofing, so that everyone knows how to remedy the bathroom waterproofing.

    What to do if the bathroom waterproofing is not done well - solution:

    Chisel the old "between the upper mouth of the floor drain and the sewer pipe and the floor slab", connect the interface between the floor drain and the sewer pipe, and then use 1:1 cement mortar and 15% of the cement content of the alum stone expansion agent to make up, you can.

    It turns out that the bathroom waterproofing is the overall flexible waterproofing, and after moving here, "brush the joint and its surroundings with cement slurry and 20% of the cement content of alum stone expansion agent", which will not affect other places in the future!

    In addition, the bathtub drain is useless, remove the bathtub, chisel the interface of the sewer pipe, first plug the nozzle and then use 1:1 cement mortar and 15% of the cement content of the alum stone expansion agent to make up, you can.

    How to remedy the toilet waterproofing - supplementary points:

    1. Alum stone expansion agent, brown red, ask where cement is sold, the unit price is 500-800 yuan, slightly more expensive than cement, but the amount is less.

    2. If you buy more than the cover (up to 1 package, 50 kg), then you can chisel off the floor tiles on the flexible waterproof layer of the original bathroom, and use 1:1 cement mortar and 15-18% alum stone expansion agent with cement content to make up the whole and reattach the floor tiles at the same time.

    3. Special attention should be paid to the fact that "the ground should be done well in the corners of the wall and the upper mouth of the sewer", and the base layer should be chiseled before the mortar, and the floating dust should be cleaned up.

    4. Pay attention to the fact that you can only get on the person after two days, so that there will be no water leakage in the future!

    The above is about how to remedy the waterproofing of the bathroom, I hope it can help you. Finally, it is worth reminding us that it is necessary to understand the toilet waterproofing practices, toilet waterproofing remedies, etc., which is very helpful to our daily life!

  6. Anonymous users2024-01-18

    01 There are 3 situations here, the first is that the wall is not treated well, and the second is that the bottom of the wall is not treated well, relatively speaking, the first is simpler than the second. The third type is a leak caused by damage to the drain pipe.

    02 If the wall is not properly treated, then we can remove the row of tiles and floor tiles near the base of the wall, and then reinstall the waterproofing. At this time, we can no longer be careless, we can test the water first, and if there is no problem, then apply tiles and wall tiles.

    03 The second situation is relatively complicated, if the bottom of the wall is not done well, and the water seeps downstairs. We had to start from scratch by breaking all the floor tiles in the bathroom and recovering them with a new layer of waterproofing.

    04 For the third option, we have a better way to deal with it, we find the drain pipe and replace it.

  7. Anonymous users2024-01-17

    1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records.

    2. Check the quality certification documents of the materials and include them in the engineering and technical files.

    3. After the material enters the site, the material inspection report shall be issued according to the specification.

    4. When all the indicators of the physical properties of the material meet the standards, it is qualified; If an index does not meet the requirements of the standard, the index should be re-sampled in the tested product for re-inspection, and the re-test result meets the requirements of the standard, and the batch of materials will be judged to be qualified.

    5. Waterproof material. There are three main categories: waterproofing membranes; 911 polyurethane waterproofing material; New polymer cementitious waterproofing material.

    The last category is divided into general-purpose GS waterproofing materials and flexible JS waterproofing materials. Among them, the universal waterproof material is suitable for the waterproofing of the indoor floor and wall of the family.

  8. Anonymous users2024-01-16

    First of all, whether your bathroom has been renovated, if the decoration has been completed, then now you have to redo the waterproof layer (you need to smash bricks or something, the cost is relatively high);

    If you are decorating and do not do a good job of waterproofing (a problem found in the closed water test), then redo the waterproofing, so that the cost will be lower than the above method.

  9. Anonymous users2024-01-15

    This is not easy to deal with, it is indeed the same as the friends above, it is not long to do waterproofing without knocking bricks, it can only be managed for a while, and it can only be done again if you want to be thorough. If you are willing to knock bricks, you can choose to use acrylic waterproof paint or JS waterproof coating, and ask a professional waterproof builder to do it if you can't do it yourself, so as to achieve the ideal effect.

  10. Anonymous users2024-01-14

    If you want to solve the problem fundamentally, you can only do waterproofing from scratch.

    The corners of the bathroom, floor drains, and pipes are areas that are prone to water leakage, and they should be strengthened during construction.

    Be sure to buy products produced by regular manufacturers, do not buy miscellaneous brands, and construct according to the packaging instructions.

  11. Anonymous users2024-01-13

    Generally, waterproofing is done before tiling, and it is not guaranteed to be done at one time, after pasting tiles found that the waterproofing is not done well and wants to remedy, the repair method of not knocking on the bricks can not be guaranteed to be effective for a long time, and no one wants to be complained by the downstairs neighbors one day in the following days. To be on the safe side, the best remedy is to knock the tiles and redo them for waterproofing.

  12. Anonymous users2024-01-12

    Hello, the remedies for bathroom waterproofing are as follows:1Reworked waterproofing:

    If there is obvious damage or defect in the waterproofing layer, the best way is to redo the waterproofing layer. Specific steps include: cleaning the old waterproofing layer, repairing the cracks in the wall and floor, priming the coating, applying the waterproofing layer, applying the waterproofing coating, etc.

    2.Leak repair: If the waterproof layer is not seriously damaged, but there is a small water leakage, special waterproof materials can be used to repair the leakage.

    Specific steps include: cleaning up the leaking parts, painting waterproof materials, strengthening the protection of the leakage parts, etc. 3.

    Sealing gaps: If there is a gap between the wall and the dry potato loss ground in the hailstorm, special sealing materials can be used to seal it. Specific steps include:

    Clean the gaps, apply sealant, compact the sealant with tools, level the surface, etc.

  13. Anonymous users2024-01-11

    1. If the wall waterproof material is not done well, it can be remedied in the later stage. If you find that there is a problem of back-moisture on the wall, you need to stop using water first, and deal with the problem of stagnant water in the bathroom first, so as to keep the whole room dry.

    2. Remove the original waterproof material, putty layer and latex layer of the wall, and you need to do it again. If the original wall has been tiled, it must also be eradicated to be able to do a good job of waterproofing from a deep level.

    3. After the wall is cleaned, it is necessary to do a good job of leveling, and then paint the waterproof material. Generally speaking, the thickness of the coating film of waterproof materials should reach more than millimeters, especially at the junction of the wall and the ground and the corners of the wall.

    3. Under normal temperature conditions, the surface layer is dry for 4 to 5 hours, and then a large area is painted for the second time, and there can be no leakage. This time, when painting, it should be in the opposite direction to the previous one, and wait until it is completely cured, and then scrape putty, brush latex paint or paste tiles, in order to achieve the effect of remediation.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose:?bdfc

Related questions
4 answers2024-02-05

There are some summary remedies, but they are limited to the circumstances, conditions, time and responsibilities that can be used by those who have time, patience and care. It is still recommended to remake the waterproof in order to get away with it once and for all. >>>More

11 answers2024-02-05

Chisel the old "between the upper mouth of the floor drain and the sewer pipe and the floor slab", connect the interface between the floor drain and the sewer pipe, and then use 1:1 cement mortar and 15% of the cement content of the alum stone expansion agent to make up, you can. >>>More

1 answers2024-02-05

Dig the best permeable waterproofing can be done by yourself. >>>More

3 answers2024-02-05

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

12 answers2024-02-05

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More