  1. Anonymous users2024-01-23

    According to the design elevation of the ceiling, the line should be played on the surrounding wall, and the line should be clear, the position should be accurate, and its level should be allowed to deviate by 5mm.

    Fix the angle aluminum along the elevation line, the role of angle aluminum is the sealing of the edge of the ceiling, the common specification of angle aluminum is 25*25mm, its color should be the same as the aluminum alloy panel, and the angle aluminum is mostly fixed on the wall column with cement nails.

    In order to ensure the integrity of the ceiling finish and the reliability of installation, it is necessary to arrange the structural size of the ceiling skeleton according to the size and specifications of the aluminum gusset, as well as the area size of the ceiling. The basic arrangement of the aluminum gusset finish is: the plate combination should be complete, and when the edge is left around, the surrounding edge should be symmetrical and uniform, and the arranged keel position line should be drawn on the top of the elevation line.

    The spacing of the main keel hanging point is selected according to the design recommended series, and the middle part should be arched, and the height of the keel arch is not less than 1 200 of the room surface span. After the installation of the main keel, the position and height should be corrected in time. To control the flattening of the keel, first of all, the longitudinal and horizontal collapse beam should be pulled out to return to the elevation control line, starting from one end, and adjusting the suspension height of the boom while installing.

    After the large surface is flattened, adjust some single keels with curved warped edges until the smoothing meets the requirements.

    The boom should be straight and have sufficient load-bearing capacity. When the boom needs to be lengthened, it must be lap welded firmly, and the weld must be uniform and full. For anti-rust treatment, the boom shall not exceed 300mm from the end of the main keel, otherwise the boom should be added to avoid the main keel falling, and the secondary keel (the same as the middle keel or small keel) should be installed close to the main keel.

    Comprehensively correct the position and levelness of the primary and secondary keels. The connectors should be installed in dislocation, and the installed ceiling skeleton should be firm and reliable, and the next step of construction can only be carried out after meeting the relevant specifications.

    When installing the square aluminum gusset, the secondary bone should be straightened. The gusset plate should be flat and not warped, and the flat error of the ceiling plane should not exceed 5mm.

  2. Anonymous users2024-01-22

    Plastic gusset ceiling installation steps.

    1. Determine the size of the installation ceiling, if you can't measure it yourself, you should ask professionals to do the measurement, this step is a crucial thing in the installation process of the plastic gusset ceiling, and the future selection and installation should be based on this size.

    >2. According to the same horizontal height to install the corner series, according to the appropriate spacing to hoist the light steel keel (38 or 50 keel), the general spacing meters, the distance of the boom is distributed according to the provisions of the light steel keel.

    >3, the pre-installed on the plastic gusset keel hanging, together with the plastic gusset keel close to the light steel keel and the light steel keel in a perpendicular direction buckle below the light steel keel, the plastic gusset keel spacing is generally 1 meter, all after the installation must be adjusted level.

    Under normal circumstances, when the vertical distance between the building and the aluminum plate to be hoisted does not exceed 600mm, it is not necessary to add 38 keels or 50 keels in the middle, but use keel hangers and booms to be directly connected.

    >4. The plastic gusset is parallel to the matching keel in order, and the plastic gusset is connected with a special keel series connector. If you accidentally leave fingerprints or stains, you can use dish soap to wash it with boiling water and wipe it dry, and the good installation process is easy to disassemble.

  3. Anonymous users2024-01-21

    What is the best detail about the installation method of plastic gusset ceiling? Let the master first determine where the ceiling is hung in and then hit the horizontal line and then nail the wooden shelf A large area of 600 * 600 shelf A small area of 400 * 400 and then buckle the buckle plate The length of each 1 buckle plate is pressed by the screwFollow the above way to operate, it is very perfect, you may wish to try it

  4. Anonymous users2024-01-20

    Answer: The ceiling is very important in the decoration of the whole room, so what are the installation methods of the plastic gusset ceiling, let PChouse tell you about it today. 1. Determine the location of the ceiling installation, that is, the height of the ceiling. According to the ceiling design and ceiling area, determine the size and specification of the plastic gusset; 2. Determine the keel position line.

    Because the keel is mainly used to support the external decorative material modeling and fixed structure, in the case that the size of the plastic gusset has been determined, in order to ensure the integrity of the installation, the structural size and position line of the keel are determined according to the panel specifications, and the determined position line is marked on the upper edge of the reference line; 3. The main keel is installed. The spacing of the main keel hanging point is selected according to the design recommended series, and the middle part should be arched, and the height of the keel arch is not less than 1 200 of the room surface span. 4. Install the boom. The boom installation should meet several requirements:

    First of all, the boom should be straight and have sufficient bearing capacity; Secondly, the boom should be treated with anti-rust treatment in advance; The boom shall not exceed 300mm from the end of the main keel, otherwise the boom should be added, if the boom needs to be added, it is best to lap and weld firmly to avoid the main keel falling; 5. The side keel is installed. The side keel should be installed close to the main keel. After installing the main and side keels, check the flatness and firmness of the keel; 6. Plastic buckle plate installation.

    The plastic gusset is buckled on the keel in parallel at one time, and connected with special connectors.

  5. Anonymous users2024-01-19

    Plastic gusset ceiling installation steps.

    1.To install a plastic gusset ceiling, the first step is to determine the location of the ceiling installation, that is, the ceiling height. Usually the ceiling should not be too low, and the height is too low to make the space seem oppressive.

    After determining the installation height, use the ink line to bounce the elevation on the surrounding walls, and the baseline should be clearly marked;

    2.According to the ceiling design and ceiling area, determine the size and specification of the plastic gusset;

    3.Determine the keel position line. Because the keel is mainly used to support the external decorative material modeling and fixed structure, in the case that the size of the plastic gusset has been determined, in order to ensure the integrity of the installation, the structural size and position line of the keel are determined according to the panel specifications, and the determined position line is marked on the upper edge of the reference line;

    4.Main keel mounting. The spacing of the main keel hanging point is selected according to the design recommended series, and the middle part should be arched, and the height of the keel arch is not less than 1 200 of the room surface span.

    After the main keel is installed, the position and height are corrected in time. Pull out the longitudinal and transverse elevation control line, start from one end, and adjust the suspension height of the boom while installing to control the flattening of the keel. After the large surface is flattened, adjust some single keels with curved warped edges until the smoothing meets the requirements.

    When installing the main keel, it is also necessary to pay attention to leaving the outlet of the lighting line;

    5.Install the boom. The boom installation should meet several requirements:

    First of all, the boom should be straight and have sufficient bearing capacity; Secondly, the boom should be treated with anti-rust treatment in advance; The boom shall not exceed 300mm from the end of the main keel, otherwise the boom should be added, if the boom needs to be added, it is best to lap and weld firmly to avoid the main keel falling;

    6.Side keel mounting. The side keel should be installed close to the main keel. After installing the main and side keels, check the flatness and firmness of the keel;

    7.Plastic gusset mounting. The plastic gusset is buckled on the keel in parallel at one time, and connected with special connectors.

    It should be noted that when installing the last board, it should be cut with a cutter according to the actual size of the final, the panel should be slightly bent and loaded, and finally sealed with beads on both sides.

  6. Anonymous users2024-01-18

    Here's how:

    1. According to the design elevation of the ceiling, the line should be clear and accurate, and the allowable deviation of the level should be 5mm.

    Second, along the elevation line to fix the angle aluminum, the role of angle aluminum is the sealing of the edge of the ceiling, the common specification of angle aluminum is 25 * 25mm, its color should be the same as the aluminum alloy panel, angle aluminum is mostly fixed on the wall column with cement nails.

    3. Determine the keel position line, because each aluminum gusset is a formed veneer, generally can not be cut into blocks, in order to ensure the integrity of the ceiling veneer and the reliability of installation, it is necessary to arrange the structural size of the ceiling skeleton according to the size and specifications of the aluminum gusset, as well as the area size of the ceiling. The basic arrangement of the aluminum gusset finish is: the plate combination should be complete, and when the edge is left around, the surrounding edge should be symmetrical and uniform, and the arranged keel position line should be drawn on the top of the elevation line.

    Fourth, the main keel hanging point spacing, according to the design recommended series selection, the middle part should be arched, the keel arching height is not less than 1 200 of the room span. After the installation of the main keel, the position and height should be corrected in time. To control the flattening of the keel, first of all, you should pull out the longitudinal and horizontal elevation control line, start from one end, and adjust the suspension height of the boom while installing.

    After the large surface is flattened, adjust some single keels with curved warped edges until the smoothing meets the requirements.

    5. The boom should be straight and have sufficient bearing capacity. When the boom needs to be lengthened, it must be lap welded firmly, and the weld must be uniform and full. For anti-rust treatment, the boom shall not exceed 300mm from the end of the main keel, otherwise the boom should be added to avoid the main keel falling, and the secondary keel (the same as the middle keel or small keel) should be installed close to the main keel.

    6. Comprehensively correct the position and levelness of the primary and secondary keels. The connectors should be installed in dislocation, and the installed ceiling skeleton should be firm and reliable, and the next step of construction can only be carried out after meeting the relevant specifications.

    7. When installing the square aluminum gusset, the secondary bone should be straightened. The gusset plate should be flat and not warped, and the flat error of the ceiling plane should not exceed 5mm.

  7. Anonymous users2024-01-17

    The specific situation also needs to determine the most reasonable installation method according to the site structure

    1. Site layout: there is a cement column on the top of the crane, and the keel is installed inside;

    2. Fixing method: advertising nails are fixed, and hardware strips are covered;

    3. Accessories: advertising nails, hardware bars, wooden strips;

    4. Description: Fix a certain number of screws on the ceiling as the keel stress, lock the translucent stone with screws, and then fix the light source on the keel, and finally fix the translucent stone on the keel with advertising nails, and wrap the edge with hardware or wooden strips at the interface to prevent light leakage.

    Note: Ensure uniform lighting, pay attention to the distance between the light source and the translucent stone product. First of all, determine the installation plan, pay off the line and drill the hole, install the whole wire boom, place the keel, level the keel, the error is 3mm, install the base liner, and the lining plate can choose nine splints.

Related questions
2 answers2024-01-27

Just use an electric hammer to hit the hole, fix the hanging ribs with plastic expansion, and fix the gusset plate with the keel matching the chandelier.

2 answers2024-01-27

Generally, it is hung on the roof with iron wire, and it is fixed with air nails.

1 answers2024-01-27

Install an adapter box first, which is on the TB.

It is recommended to install LED integrated lamps to save energy. >>>More

1 answers2024-01-27

Plastic gusset installation process:

Elevation of elastic line, installation of the main keel, installation of the boom, installation of the side keel, installation of plastic gusset. >>>More

1 answers2024-01-27

PVC gusset ceiling steps:

1. Measure the length and width of the room, and determine the length of the gusset and the installation direction of the horizontal and vertical; >>>More