Central Kitchen How to build a standard and standardized central kitchen

Updated on Kitchen 2024-01-28
2 answers
  1. Anonymous users2024-01-23

    First of all, the floor of the central kitchen should meet the standards.

    After the research and summary of Kecong flooring, it is recommended that the central kitchen be laid with polyurethane mortar flooring, which can play a waterproof and environmentally friendly role. Kecong polyurethane mortar floor is a functional floor material, its composite has almost all the advantages of organic polymer and inorganic concrete, it has a unique high performance, especially suitable for food hygiene, chemical corrosion, high temperature and humid heat, low temperature freezing, heavy load and strong impact of extreme industrial environment, service life of up to several decades.

  2. Anonymous users2024-01-22

    Area requirements: In principle, the area of food processing operation and storage sites shall not be less than 300 square meters, depending on the large amount of food supplied by the enterprise itself.

    For specific requirements, please refer to: "Central Kitchen License Review Specification".

    Including: 1. Site selection requirements;

    2. Site setting, layout, separation, area requirements

    3. Food handling floor, drainage, walls, doors, windows and ceiling requirements;

    4. Requirements for hand washing and disinfection facilities;

    5. Requirements for cleaning, disinfection and cleaning facilities of public utensils, facilities and equipment;

    6. Requirements for processing food equipment and tool box containers;

    7. Requirements for ventilation, smoke exhaust, lighting and lighting facilities;

    8. Requirements for warehouses and food storage places;

    9. Special room requirements;

    10. Locker room requirements;

    11. Toilet setting requirements;

    12. Requirements for transportation equipment;

Related questions
1 answers2024-01-28

There are a few things about the hotel kitchen design standards: >>>More

1 answers2024-01-28

You have a deliberate question to ask a question, and you can't find the source of the stuffy information, and the file is probably not very authoritative, so go directly to the decoration company to find the master and ask you to get a manual.

1 answers2024-01-28

Standardized central kitchen construction:

The production line process of the kitchen mainly includes three aspects: processing, preparation and cooking >>>More

2 answers2024-01-28

There are tools on this Kujiale to draw a floor plan by yourself to feel it, and you can also find out if there is a matching house plan with your home, and see how it is designed, haha You can also ask the professional designers above, these can not be asked, or make good use of the hulala.

10 answers2024-01-28

1. Vegetable pretreatment area: continuous vegetable washing machine, rhizome vegetable washing machine, sampling vegetable washing machine, automatic continuous leafy vegetable washing line, automatic continuous rhizome washing line, automatic flip vegetable washing machine, fruit and vegetable peeling machine, vegetable cutting machine, etc. >>>More