If the bathroom downsizing plate is entered according to the staggered level in PKPM?

Updated on Bathroom 2024-10-01
1 answers
  1. Anonymous users2024-01-24

    Bathroom drop board, general residential drop board 30 50mm, the installation is a toilet, this is to prevent bathroom water from flowing into other rooms, if it is a public building, basically more squatting toilets, which requires a drop board 300mm.

    Model input for split-level structures.

    1 When the height of the split layer is not greater than the height of the frame beam, it will be combined into one standard layer input.

    2. For a single-tower split-layer structure with a height greater than the height of the frame beam, separate the input of two standard layers, enter what you see, and do not add virtual beams, etc.

    3. For multi-tower split-level structures with a height greater than the height of the frame beams, the split-layer calculation is realized by modifying the layer height in SATWE instead of entering the split-layer when PMCAD modeling.

    4. If the local floor slab is staggered, it refers to the situation of a mezzanine. When the mezzanine is very small, it is not entered, and only the mezzanine load is recorded; When the mezzanine area is large, the new standard layer is imported.

    5 Input for split-level openings. At present, the PKPM version is as follows: nodes are added to the end of the shear wall beam, and the connecting beam is entered according to the ordinary beam. There will be changes to the new version of PKPM at the end of the year.

Related questions
1 answers2024-10-01

Enter the height of the staggered floor in the staggered floor, and the beam line of the formwork diagram generated by PKPM is a solid line, if the template is drawn by hand, there is no need to set the staggered layer.

3 answers2024-10-01

When calculating, set the wall as one or two walls to take the bulk density of ordinary bricks 18 (generally used ordinary machine bricks, take 19) KN square meters, and take 17 (lime mortar, mixed mortar) KN square meters for the ash layer, so that the load generated per square wall is: >>>More

4 answers2024-10-01

If there is no falling plate, it will be made to drain the same layer without falling plate. Toilet drainage is roughly divided into heterogeneous drainage and same-layer drainage. At present, the drainage of the same layer is divided into the drainage of the same layer, the micro falling plate, and the non-descending plate. >>>More

3 answers2024-10-01

The bathroom slab is generally lowered by about 100, and the surrounding beam height is generally greater than 200, so that even if your floor slab is 100 thick, the slab is still within the support of the beam, that is, the support of the beam or the slab. As for the negative reinforcement, of course, it cannot be penetrated with the adjacent slabs, because the elevation is different and cannot be penetrated, so the negative reinforcement can be considered to extend into the beam.

1 answers2024-10-01

The split-level floor slab is drawn using separate floor slabs (if the height difference is relatively large) There is also a situation where the height difference of the bathroom is very small, and the material on the side of the floor and the side of the wall can not be solved temporarily with a false elevation, and the workaround method one is directly mapped, and the menu bar - modify - fill in the color - select this marble material This method has a thickness of 0 Method 2 A new layer can be used to do it with a wall, and the thickness is the thickness of the surface layer.