How to optimize the design and carry out ceiling construction after the pipeline has been constructe

Updated on Suspended ceilings 2024-10-05
1 answers
  1. Anonymous users2024-01-24

    There is no point in optimizing the optimization after the construction has been completed, either continue to do it or rework.

Related questions
2 answers2024-10-05

When the master goes up to the construction, the owner really needs to make some necessary preparations. >>>More

2 answers2024-10-05

There is usually only one toilet on the construction site.

6 answers2024-10-05

Zhejiang Provincial Civilized Construction Regulations Canteens should be set up at a distance of not less than 20m away from toilets, garbage stations and hazardous substance places, and not less than 10m away from office and living rooms.

1 answers2024-10-05

It is roughly estimated according to the scale of the project and the number of organizational personnel, so it is impossible to calculate it in such a general way.

1 answers2024-10-05

Wardrobes, cabinets, decorative cabinets, bookcases, tatami mats and other customized furniture, even if there are more in the decoration, are now generally produced in the factory, assembled and installed on site, and other furniture is basically movable.