After the installation of the light steel keel ceiling, how to install the plywood and gypsum board

Updated on Suspended ceilings 2024-09-30
4 answers
  1. Anonymous users2024-01-24

    Light white steel keel ceiling installation gypsum board and splint method, steps:

    1. Before the installation of the gypsum board, pull through the line under the keel to control the gap of the gypsum board when installing, leave a 5mm gap between the gypsum board and the gypsum board, and the nail distance of the fixed gypsum board shall not be greater than 150mm, and the nail cap must be 1 2mm into the board. Use putty to flatten the seams and nail holes (nail holes should be treated with rust prevention), and put bandages on the seams.

    2. When the keel is hoisted and plywood, the double-layer splint should be hoisted, the bottom layer is 5 centimeters ordinary plywood, and the surface layer is a good quality imported or joint venture 3 centimeter plywood to ensure that the surface layer will not be layered and bubbling. When installing, it should be noted that the joints of the bottom layer and the top layer of the splint must be staggered with each other, and at the corners, the whole plate should be used for the transition, and no joints should be left at the corners.

    Note: The seam of the surface layer should be left 3mm, and the bilateral groove. Before scraping the putty, fill it with wood glue powder in 3 times and scrape it flat. When the ceiling splint is installed and fixed, the distance from the wall shall not be less than 10mm.

  2. Anonymous users2024-01-23

    The light steel keel is generally an.

    bai plaster.

    After the DU board, the light steel keel skeleton is erected, and it is directly used from the dao

    If you need to install the splint, you should pay attention to the keel spacing when building the skeleton, because the size of the splint is 122*244

    The size of the plasterboard is 120*240

    Yueqing Ding'an Light Steel Keel Factory will answer for you, hoping to help you.

  3. Anonymous users2024-01-22

    Do not use splint in the same direction as drywall!

  4. Anonymous users2024-01-21

    Methods and steps for installing gypsum board and splint in light steel keel ceiling:

    1. Before the installation of gypsum board, pull through the line at the lower mouth of the keel to control the gap of gypsum board installation to be straight, leave a 5mm gap between the gypsum board and the gypsum board joint, and the nail distance of the fixed gypsum board shall not be greater than 150mm, and the nail cap must be 1 2mm into the board. Use putty to flatten the seams and nail holes (nail holes should be treated with rust prevention), and put bandages on the seams.

    2. When the keel is hoisted and plywood, the double-layer splint should be hoisted, the bottom layer is 5 centimeters ordinary plywood, and the surface layer is a good quality imported or joint venture 3 centimeter plywood to ensure that the surface layer will not be layered and bubbling. When installing, it should be noted that the joints of the bottom layer and the top layer of the splint must be staggered with each other, and at the corners, the whole plate should be used for the transition, and no joints should be left at the corners.

    Note: The seam of the surface layer should be left 3mm, and the bilateral groove. Before scraping the putty, fill it with wood glue powder in 3 times and scrape it flat. When the ceiling splint is installed and fixed, the distance from the wall shall not be less than 10mm.

Related questions
1 answers2024-09-30

Don't even think about it, it is absolutely forbidden to install such a heavy lamp on the light steel keel! >>>More

3 answers2024-09-30

There are two common ways to do this.

The first is to directly fix the aluminum-plastic panel on the keel through the self-tapping screw, so that there will be a nail cap, but it can be densely assembled. >>>More

1 answers2024-09-30

After the completion of the integrated ceiling, there are two major problems in installing the bath bomb: one is whether the bath bomb exhaust can be connected to the air outlet pipe of the building, and the other is the line of the bath bomb switch. If the air duct problem can be solved, the bath bomb switch can only go to the bright line.

3 answers2024-09-30

It is recommended to consult the mineral wool board manufacturer.

1 answers2024-09-30

The spacing of the main keel is about 1 meter normally, and the spacing of the hanging ribs does not exceed one meter, and the hole can be punched in accordance with the above rules.