I would like to ask for a paper on A Brief Description of the Decoration Construction of the Living

Updated on Living room 2024-09-13
1 answers
  1. Anonymous users2024-01-24

    I don't know what kind of building is the main one, I have a share here, you can refer to it.

    1.Civil construction phase.

    It mainly includes the removal of walls, the replacement of door and window frames, the installation of bathing facilities, the erection of partitions, the renovation of plumbing and urinals, the laying of hidden pipes on the walls, the laying of floor tiles, the laying of tiles and other projects. At this stage, the number of renovation workers is large, and the home is the dirtiest and messier, and the outline of the entire decoration cannot be seen. And everywhere to hit the wall drilling, the hammer sound is deafening, the electric drill thunders, the dry sound is the largest, and the impact on the neighbors is also the greatest.

    In order to catch up with the schedule, some renovation teams often do not stop work regardless of whether it is a holiday or not, even late at night, which can easily cause resentment in the neighborhood. Therefore, it is important to pay attention to the construction time and do a good job of explaining it to the neighbors.

    2.Grassroots processing stage.

    It mainly includes carpentry work such as doors, door and window covers, curtain boxes, heating covers, baseboards, furniture, etc., wall scraping putty, leveling, and some modeling foundation work. At this stage, the number of renovation workers is much smaller, and the family has a slight eyebrow; Chainsaws, drills, and nail guns are used more, and the noise is significantly reduced compared with the previous section, but it is necessary to pay attention to the problem of disturbing neighbors. At this stage, it is important not to forget to carry out the acceptance of some concealed works.

    Take the door as an example, generally use MDF or blockboard as the base timber, and then paste red beech and other decorative panels, and accept them when doing the base layer, otherwise after pasting the decorative panel, what is inside will not be seen.

    3.Detailing stage.

    Mainly paint and coating, as well as other finishing touches such as doorknobs, switches, outlets, etc. If the wall and top surface treatment are uneven, they need to be sanded and painted again; Nowadays, the nitro varnish commonly used in home decoration needs to be brushed seven or eight times. At this stage, the required renovation workers are only three or two, and there is basically no noise.

    This stage is very important, because whether the decoration workmanship is fine or not, and whether the effect is not produced mainly depends on this time. Therefore, do not rush to rush the construction period, and at the same time prevent the construction personnel from being lazy, such as painting only two or three times.

Related questions
1 answers2024-09-13

You go to the house where there is a restaurant on the left and right side of the street. >>>More

2 answers2024-09-13

It has been sent to your mailbox, please check:

4 answers2024-09-13

Do you know what designers live on?

4 answers2024-09-13

Jazz Restaurant.

Appetizers (from $25). >>>More

2 answers2024-09-13

Yes, this is called property theft insurance.