Hotel bathroom, if the ground does not want to be raised with cement, how to do it?

Updated on Bathroom 2024-09-10
2 answers
  1. Anonymous users2024-01-24

    Can be raised with a lightweight aerated block!

  2. Anonymous users2024-01-23

    There is water in the bathroom, and it is difficult to get it with aerated concrete blocks.

    Make some bricks underneath, fill the gaps with sand, stick the floor tiles, and it will be easy to dismantle in the future.

Related questions
3 answers2024-09-10

Directly use cement as the floor, as long as the waterproof layer is done before the cement is laid, the floor is done well, the cement label is enough, and the cement floor will not crack after it is done, and it will not leak.

2 answers2024-09-10

As for how to wrap the pipe, the landlord told the bricklayer what he meant, and they hoped that my answer would help you have your own arrangements, and the landlord did not need to worry about it now.

1 answers2024-09-10

To do waterproofing, you need to do it on the front of the water. >>>More

4 answers2024-09-10

Are you sure it's 20 centimeters, 2 decimeters, and a bundle is more than long, shouldn't you see the sewer at this time? >>>More

1 answers2024-09-10

If there is a crack, I suggest that you use cement slurry to dry the crack, and then brush it without leakage.