Is it harmful to stick kitchen tiles after blisters for a long time?

Updated on Kitchen 2024-09-12
2 answers
  1. Anonymous users2024-01-24

    There's nothing wrong with soaking tiles in water! But there is a degree! It shouldn't be too long!

    Generally, the soaking time before brick paving is not less than 2 hours, and 10 hours is enough! Don't exceed! and dry in the shade after paving.

    No matter what kind of tile, there are certain pores, before paving the tiles, he will soak in water, in order to let the pores fully absorb the water, too dry then the service life will be greatly reduced, after absorbing sufficient water, smeared with cement mortar, so as not to absorb his water, so that the quality of the paving can reach a certain standard, and it is not easy to appear hollow, fall off and even crack the phenomenon of leakage stains in the future!

    Rest assured! In addition:

    The wall tiles should be made of 2:1 cement mortar wet paste process, and pure cement wall tiles are not allowed.

    I don't think the floor tiles can be soaked in water! The professional workers of the general decoration company know this truth! Dry cement mortar with a volume ratio of 1:3 should be used for paving tiles, and the dry paving process should be adopted.

    The width of the non-whole brick of the wall tile shall not be less than 1 3 of the whole brick, and the non-whole wall and floor tiles shall be discharged in the secondary part or at the corner of the shade.

    Before the wall and floor tiles are paved, the horizontal marking line should be positioned, and the wall tiles should be hung with vertical lines during the construction process, and the floor tiles should be pulled with tic-tac-toe lines.

    The wall tiles should be made of 2:1 cement mortar wet paste process, and pure cement wall tiles are not allowed.

    Dry cement mortar with a volume ratio of 1:3 should be used for paving tiles, and the dry paving process should be adopted.

    The joints of wall and floor tiles should be dense, straight, and clean, and carried out within 24 hours after the completion of construction.

    Kitchen and bathroom tiles should be paved with a slope of 1-2% along the direction of the drainage outlet, and the floor drain should be set at the lowest place.

  2. Anonymous users2024-01-23

    The tile should be soaked in water completely and smoothly, and the time should not be too long, or it is not easy to break and deform.

Related questions
2 answers2024-09-12

The last time I bought the quality of the fashion ceramics, the details are to measure the size of the cabinet in advance, calculate the water potential, etc., before pasting the kitchen tiles, know how to wiring; Ensure that the countertop of the kitchen cabinet is consistent with the joints of the bricks, and cut the tiles in advance; At the beginning of tiling, try to reserve as many holes as possible.

1 answers2024-09-12

1. All of them can be pasted, so that you can use a very advanced tile paste to paste tiles, commonly known as thin paste. >>>More

4 answers2024-09-12

1. All home decoration is generally 2.4 meters high, too high your bath bomb effect is not good, too short space and small to appear depressing, air circulation influence. General building code for suspended ceilings low and high meters, you can stick meters. If it is pasted with rice, there is only rice after the ceiling, which can also be used.

4 answers2024-09-12

Generally, it won't fall. But there are still prerequisites. >>>More

3 answers2024-09-12

1. The oil-proof sticker is a self-adhesive sticker with adhesive backing, as long as the place where the oil-proof paper is pasted has a good base layer and is not easy to fall off, such as ceramic tiles, cement mortar stucco surface layer, artificial stone, etc.; >>>More