-
Do you have a house type?
I can do design.
CAD and renderings are fine.
-
Generally, it is 25 yuan per square.
Medium sand: 48 Thickness (in m) = N (m square).
Cement: 48 Thickness (unit m) = N (m square) 6 bales = M bales, ground leveling, the quality can be slightly worse. >>>More
Irrigation definitely won't work, ant underground nests lead in all directions! >>>More
5 times 5 equals 25 square meters, which requires 25 square meters of flooring.
Take the elevator room as an example, about 14,000. Cement with sand, wages. Floor tiles are medium 55 yuan, earth tiles are 8 times 8, 12 yuan wall tiles are 3 times 6. The salary is 30 square meters. I just installed it, 92 flat.
Find a magnet block and tie it to a wooden stick with a rope, making sure to tie it securely. Then I put it in the sewer pipe and pulled it out all at once.