Entrance door installation construction plan

Updated on Entrance door 2024-09-13
2 answers
  1. Anonymous users2024-01-24

    Well, if your home is renovated and you go to accept it, you can look at the installation of the entrance door from the following aspects, after all, the entrance door is a very important door in the whole home:

    1) Door frame inspection: whether the door frame is installed firmly and well, whether the door frame and the wall are tightly sealed, and whether the door surface is cracked or damaged;

    2) Door leaf inspection: whether the door leaf is deformed and cracked, whether the paint surface is falling and missing brushes and bumps, whether the surface is smooth, whether there are obvious scratches, and whether the ground decoration is considered from the ground;

    3) Door lock inspection: whether the door lock is installed firmly, evenly locked, whether the key insertion and unplugging is smooth, whether the lock cylinder rotates flexibly, and whether the lock hole position is normal;

    4) Opening inspection: whether the door is opened and closed smoothly, whether there is abnormal resistance and wear, whether the door is stable and no shaking after locking;

    5) Doorknob inspection: whether the installation is firm, whether there is abnormal resistance when rotating, and whether there is defect or deformation on the surface;

    6) Door shaft inspection: whether it is complete and firm, and the rotation is stable;

    7) Door accessories: check whether the door body and various hardware accessories are complete and firm.

  2. Anonymous users2024-01-23

    The main thing is not to affect other artificial principles to decide whether the door is open inside or outside.

Related questions
1 answers2024-09-13

3. The construction plan of all commercial kitchens is not fixed, it is adapted to local conditions, different kitchens have different construction plans, you can find a professional kitchen engineering company to design for you, including construction. >>>More

3 answers2024-09-13

Preparation for the installation of aluminum veneer ceilings >>>More

1 answers2024-09-13

PVC board ceiling.

1) Hang the light steel keel first and pull the horizontal line. >>>More

4 answers2024-09-13

Indoor ceiling demolition construction plan: first ensure the safety protection of the ceiling removal area, then remove the veneer of the ceiling, or gypsum board, and remove the light steel keel auxiliary keel, side keel, light steel keel main bone, suspension bars and so on. Cleaning, cleaning the grounds.

2 answers2024-09-13

You should find a developer, there should be beams if there are doors and windows, and ask them to rebuild the beams, as for the steel beams or concrete, you don't care, and sign an agreement, in case the door is deformed in the future, the consequences are responsible for the developer.