-
Depending on your delivery agreement, some only include the entrance door, not the door inside, and a bit of all doors are all-inclusive.
Replace the Class A door, the installation of the engineering door is good, and in the long run, the worker will be damaged when opening and closing.
Wrong, generally buildings have drawings, and the drawings will be set according to national requirements whether the fire door needs to be installed, and the size and location of the fire door will be indicated at the same time.
Let him pay 2W5, including mental expenses, lost work expenses, and carriage and horse expenses. >>>More
The developer's "door-to-door dry balance" should be changed if it is correct or lost?
If the developer clearly states in the purchase contract that the anti-theft door will be installed, the unqualified one can refuse to sign the house receipt and ask for replacement. The owners can join forces, otherwise it is difficult to do it alone.