How to make waterproof m in the bathroom

Updated on Bathroom 2024-09-26
1 answers
  1. Anonymous users2024-01-24

    Toilet waterproofing specifications.

    1. Waterproof construction should be used for coating film waterproof materials.

    2. The performance of waterproof materials should meet the provisions of the current national standards, and there should be a product qualification certificate.

    3. The waterproof cement mortar screed layer is densely combined with the foundation, without hollowing, the surface is smooth and clean, without cracks, sanding, and the yin and yang angles are made into an arc.

    4. The waterproof layer of the coating film is evenly brushed, and the thickness meets the requirements of the technical regulations of the product, and the general thickness is not less than the bottom.

    5. The use of construction stubble should be lapped in the direction of flowing water, and the lap width should not be less than 100mm, and more than two layers of fiberglass cloth should be staggered by one-half of the width when the upper and lower laps are used.

    6. The surface of the base should be smooth, and there should be no defects such as hollowing, sanding, and cracking. The moisture content of the base layer should meet the construction requirements of waterproof materials.

    7. The waterproof layer should extend from the ground to the wall, 250mm above the ground. The waterproofness of the bathroom wall shall not be less than 1800mm.

    8. The surface of the coating film is not blistered, does not flow, is smooth and has no concave and convex, and the joints of pipe fittings, sanitary ware feet, floor drains, and drainage ports are tight, and the end is smooth and non-leaking.

    9. The thickness and strength of the cement mortar of the protective layer must meet the design requirements, and it is strictly forbidden to destroy the waterproof layer during operation.

Related questions
10 answers2024-09-26

If you're worried about water leakage, the most direct way is to test the water. If there is a water mark on the root of the pipe, it must be that he didn't wrap the pipe for you, or he didn't make it tight. If you want to paint yourself, you can buy some polyurethane, but you don't use much of that, and most of it is sold in barrels. >>>More

1 answers2024-09-26

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

1 answers2024-09-26

Toilet waterproofing practices:

1. Ground treatment. >>>More

9 answers2024-09-26

Make your own waterproofing and brush polyurethane waterproof paint. >>>More

4 answers2024-09-26

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More