Is it necessary to adjust the height limiter when the tower crane is raised?

Updated on Suspended ceilings 2024-09-30
1 answers
  1. Anonymous users2024-01-24

    The following is the tower crane jacking and attachment scheme.

    Tower crane jacking For today's horizontal boom tower crane, the extension of the front boom and the rear balance arm is larger, and the unbalanced bending moment is caused to the center of the tower. In addition, the weight of the upper part of the tower crane is also larger, and the weight of the upper part of the QTZ80 tower crane and QTZ125 tower crane is about 35t.

    1. The operation procedure of the tower crane jacking work There is a jacking sleeve in the upper structure of the tower crane, which is set outside the standard section of the tower body, and the height is greater than 2 standard sections of the tower body, and a large introduction window is opened on the upper side of the front side, and a standard section can be introduced.

    At the time of jacking, with the support of the sleeve, the hydraulic pump station is started to work, so that the piston rod in the cylinder stretches out, and the tower crane superstructure is jacked, so that a standard section is introduced or removed from the window, and the tower crane is raised or lowered. Fig. 1 is a schematic diagram of the hydraulic jacking process of a cycle of tower crane. The descent process is reversed.

    2. The requirements in the jacking procedure and the balance of the safety link adjustment: The structure of the upper part of the tower crane forms a bending moment to the center of the tower mast: the bending moment in the backward direction formed by the counterweight block and the counterweight arm and the winch mechanism above, and the bending moment formed in the forward direction is mainly the crane arm, the torque of these three parts to the axis is stationary and cannot be changed, and the trolley on the crane arm can move, and the bending moment formed by the front boom can be changed.

Related questions
1 answers2024-09-30

It's not nonsense, according to the building fire code, the wood used for the ceiling should indeed use fireproof coating.

1 answers2024-09-30

Step 1: Determine the model of the host First of all, consider the area and orientation of the house to see if there are large areas of glass windows, so as to calculate the maximum simultaneous use coefficient of the air conditioner. Generally speaking, in the ordinary home environment, the cooling capacity required in actual use is often not the synthesis of the cooling capacity of all rooms, but is lower than the latter, and the former only needs to reach 60% of the latter...

2 answers2024-09-30

Now there are too many materials on the market, all kinds, and then there are many functions, fortunately, my home has been installed, and the gypsum side crane of the AIA is a prefabricated part, so the installation is quite fast, it is recommended that this material, and the surface is the kind of smooth and smooth you want.

2 answers2024-09-30

Not necessarily, the refrigeration part of the central air conditioner is in the air conditioning room, this part of the fault does not need to dismantle the ceiling, if it is an air supply pipe, it depends on the design of the air duct, and most of the tuyere controllers do not need to be dismantled. >>>More

1 answers2024-09-30

Maintenance is not required to remove the roof, generally there will be a 40cmX40cm access port next to the machine.