How to decorate the kitchen and bathroom for short term transition of the blank room

Updated on Kitchen 2024-09-10
2 answers
  1. Anonymous users2024-01-24

    How short a short time makes.

    But the ground is better to be tiled, and the rest of the world cement mortar can be covered.

  2. Anonymous users2024-01-23

    Do waterproof hydropower renovation - brush waterproof paint - stick floor tiles - install, and then use it directly.

Related questions
3 answers2024-09-10

First of all, we must find the cause of the water leakage, if it is a small hole or the joint is not connected, you can use stone glue or glass glue to repair, do not use water for 24 hours after repair, if the pipe is cracked, it is recommended to replace the pipe. After completion, check the leakage of the water pipe: 1) Test whether the water inlet pipe is leaking 1) Write down the data of the water meter, and let the upstairs not use any water at this time. >>>More

2 answers2024-09-10

One is the sewer pipe, one is the washbasin, and the other is the water heater. >>>More

4 answers2024-09-10

Before the developer delivers the house, it should have done the waterproofing of the bathroom and kitchen, done the "24-hour closed water test" and passed the inspection, so that such a house can be said to be "the project inspection and qualified" in principle; Therefore, after you finish laying the pipelines of water and circuits, you should first do the waterproof construction of the original waterproof construction before preparing to "level" the ground and wall and plaster the cement mortar. As for how to do it, the waterproof material is to use a certain waterproof colloidal material (according to the price, local customary use of varieties, the location and situation of the mechanism that needs to be waterproofed, etc.) and the "pure cement" (generally 425 or 525 cement) without yellow sand mixed according to the specified proportion, and then mix with clean water to the "consistency" suitable for construction, carefully paint the construction surface that needs to be waterproof, and then do the relevant "closed water test" after 24 hours of completion. Other construction on the ground.

2 answers2024-09-10

Hello, you can decorate with floor leather. It doesn't cost much. You can do it yourself.

4 answers2024-09-10

It can be changed, add an elbow to the ground and change it as far as you want, and then build a platform with bricks.