How to deal with the waterproofing of the bathroom ceiling

Updated on Bathroom 2024-09-26
5 answers
  1. Anonymous users2024-01-24

    (1) The ground needs to be lowered a little before the ceiling is suspended. And it can only be hung strip type top. Because the minimum requirement for a strip ceiling is 5cm, and the minimum requirement for a square aluminum gusset is 10cm.

    2) The top surface is brushed with waterproof latex paint.

  2. Anonymous users2024-01-23

    Bathroom waterproofing is generally only done on the ground and wall, and the roof is not waterproofed. In order to prevent water leakage upstairs caused by breaking through the roof (i.e., the bathroom floor upstairs) on the ceiling, and also asking for compensation for damage to the waterproofing upstairs, you must pay attention to the depth of the borehole when doing the ceiling.

    Leibangshi - home waterproofing expert.

  3. Anonymous users2024-01-22

    The scope of waterproof construction of the bathroom is: the ground and the wall.

    The ceiling is a matter of the shed, and does not involve waterproof construction.

  4. Anonymous users2024-01-21

    The ceiling should be handled by the upstairs occupants, and you have to take care of the waterproofing of the floor in your home.

  5. Anonymous users2024-01-20

    Pay attention to gluing during installation.

Related questions
3 answers2024-09-26

The bathroom is waterproof, the most standard requirement is that the ground needs to be done, the wall should be at least meters high, it is recommended to do full height, if it is a light wall, then it must be done full height. >>>More

3 answers2024-09-26

Be sure to tile it!

The floor leather is not waterproof, and I am afraid of soaking, and the wallpaper is drenched in water, and it is better to use tiles that can be used for a long time and do not need to be changed often >>>More

3 answers2024-09-26

If it is a coil or non-woven fabric, it should be repaired locally; If I repel paint, I will redo it. After the construction is completed, it must be done 24H to hold water.

2 answers2024-09-26

I had to rebuild this piece and rebuild the floor.

The main reasons for the partial arching of the wooden floor are as follows: >>>More

7 answers2024-09-26

The bathroom is waterproof, and the surrounding walls need to be painted at a height of not less than 30 cm; If there is a shower, the height of the waterproof paint applied on the installation of the shower faucet and the adjacent wall should not be less than 150 cm, preferably about 180 cm. >>>More