    Construction process of pipeline rubber and plastic insulation pipe: pipeline surface cleaning, insulation material cutting, glue application, insulation molding, insulation layer construction. The precautions for construction are:

    1. The interface and all the gaps of the insulation material are required to be tightly bonded with closed-cell foaming rubber and plastic special glue, and there shall be no poor or loose bonding.

    2. Pipeline insulation should be carried out in accordance with the design requirements and specifications, especially the thickness of the insulation layer should be according to the requirements of the design, and it is not allowed to change the insulation practice without authorization.

    3. When bonding the insulation material, the debris, dust and oil on the surface of the pipeline must be cleaned to ensure the bonding effect of the glue. In order to ensure the visual effect of thermal insulation, the longitudinal joint of the insulation layer should be placed on the upper part of the pipeline, and the longitudinal joint of the adjacent insulation layer should be staggered at a certain angle. During thermal insulation construction, the rubber and plastic insulation material should not be stretched too tightly, so as to prevent the insulation layer from shrinking and opening the glue when the temperature is too low in winter.

    4. The insulation material in the casing must be stuffed and closely connected with the pipe insulation.

    5. The insulation must be smooth and beautiful on the surface of the insulation, there shall be no unevenness, the practice is correct, the force should be uniform when wrapping, the connection and stubble are reasonable, the tape and glue are tight and firm, the sealing is tight, and there is no hollowing and loosening.

Related questions
2 answers2024-09-14

Since the insulation layer is an empty foam inside, it is the sound of a hollow drum when struck. Therefore, it is possible to paste tiles on the insulation layer, but it is impossible to check whether there is a hollowing problem in tile paving.

1 answers2024-09-14

Sticking floor tiles can not be shoveled, but it depends on whether the balcony is a plane with other areas, and it has to be shoveled if it is high, and it must be shoveled if it is pasted with wall tiles, otherwise it will affect the adhesion of wall tiles.

2 answers2024-09-14

This one is definitely not going to work! Because the insulation layer is only asbestos net and foam, it can not absorb the moisture of the cement at all, so it will definitely fall off after a long time, and it is recommended that the landlord modify it as soon as possible to avoid future losses! I heard that Chenyang water paint products are good, you can go to a nearby store or online to see, I hope it will help you.

1 answers2024-09-14

The insulation layer should be shoveled off.

It is important to shovel off the insulation layer because the insulation layer is made of asbestos net and foam, it is not flat, and there is no other way to receive the moisture in the cement. >>>More

2 answers2024-09-14

After spraying the interface agent, the cement mortar is painted, and the cement mortar is solidified and then sprayed with the interface agent, and then the tile is paved firmly and does not fall off. I hope my answer can help you.