How to fix the leakage of the extra hole in the bathroom

Updated on Bathroom 2024-09-09
1 answers
  1. Anonymous users2024-01-24

    1.Cleaning: Clean the bathroom floor and wall, focusing on the joint between the root of the water pipe and the floor tiles, the perimeter of the floor drain, the combination of toilets, sanitary ware and floor tiles, and the roots of the four walls. This step is very important!

    2.Filling: The floor drain, water pipes, sanitary ware, these and floor tiles combined, as well as the surrounding wall roots, the more obvious cracks on the wall and ground, all with cement mortar, or grout re-scraping filling, the requirements should be careful, complete, no omission, batch scraping smooth, dense!

    Then let it dry! 3.Brushing: Pour the cover of "Qingquan Toilet Anti-seepage Repair Agent" on the floor of the bathroom, and scrape it evenly from the center to the periphery with a wooden board or scraper, until the entire bathroom floor is scraped, requiring uniform absorption and saturation!

    4.Wipe dry: Wait half an hour to 1 hour to dry the excess anti-seepage refiller remaining on the bathroom floor.

    5.Maintenance: Do not have open water to rinse and soak within 12 hours after construction, and try to wait until 24 hours later if you want to do a closed water test.

Related questions
4 answers2024-09-09

Start by finding the cause of the water leak. Then you can get it yourself, and if you can't call it waterproof, someone will do it for you.

2 answers2024-09-09

It's better to ask a professional maintenance worker to do this, and it's hard to find the problem yourself.

1 answers2024-09-09

1. What kind of waterproofing is used for all backfilling? >>>More

3 answers2024-09-09

If there is a water leakage problem in the upstairs bathroom, the downstairs residents can not repair it, even if it is repaired, it can not be solved at all, and can only be repaired from the bathroom of the upstairs residents, if it is serious, only the ground is smashed again, and the waterproof layer is re-done (the water is discharged to do a closed water test, and the observation is more than 24 hours without leakage), and then the floor tiles are re-attached (the waterproof layer cannot be destroyed).

6 answers2024-09-09

You're talking about a leak in a new house that I'm living in. >>>More