-
standard door, non-standard door;
If you draw a 1:100 scale drawing, you can create a new layer because the scale is doubled. Also available at 1: >>>More
In this case, if it is fully enclosed, the entire area should be counted, and if it is not enclosed, it will be counted. Half of it. Generally speaking, real estate developers like to count half, there are gifts, there are selling points!
1. The sofa position is a must.
Otherwise, there is no support behind you, and it is very insecure to sit. >>>More
The main floor plan of the main building also uses a maximum scale of 1 500 or more, i.e. a balcony of 1 metre, which is only 2 mm on the drawing. When a large range of 1 2000 is used, it simply does not behave.
Hello, whether there is a waterstop under the exterior wall of the balcony of the secondary structure of the building. Some non-load-bearing masonry, structural columns, lintels and other parts that need to be completed before decoration in frame, shear wall and frame shear engineering are called secondary structures. The process time of the secondary structure is constructed after the completion of the construction of the primary structure (referring to the load-bearing member part of the main structure), which is relative to the load-bearing structure, and is a non-load-bearing structure, and the maintenance structure, such as structural columns, ring beams, water-stopping anti-beams, parapet walls, roof-pressing walls, infill walls, partition walls, etc.