How to make the wall tiles of the bathroom for a long time

Updated on Bathroom 2024-09-18
2 answers
  1. Anonymous users2024-01-24

    The bathroom should be paved with non-slip, non-susceptible, easy-to-clean floor tiles, and the paving work should be carried out after waterproof treatment, floor height and solidification, ceiling, wall façade finishing and bathtub and cabinet installation.

    The details are as follows: 1) Pop up the longitudinal and transverse reference lines, and require an angle of 90 degrees or 45 degrees with the door frame.

    2) Eliminate floor tiles that do not meet the quality requirements such as large color difference, cracks, missing corners, glaze damage, warping, etc.

    3) Each row of shops must be checked with a ruler or through line. Transverse straightness and surface flatness.

    4) Non-whole bricks should be laid out of the line of sight.

    5) Cement slurry for laying can be pure cement, or 1:2 fine yarn slurry can be used. The back of the brick should be full and full when the ash is batched, and it should be patted with a rubber hammer after paving.

    6) When the cement has not solidified after the floor tiles are laid, protective measures must be taken, and the gravity should not be borne on it to prevent high and low dislocation.

  2. Anonymous users2024-01-23

    Thank you for this friend's trust in me, generally speaking, if it is because the bathroom has been dirty for a long time, you can use multi-functional stain remover as a cleaner Use a softer material, such as: the sponge block of the bowl is better, and choose the gap of the brick Yes, you can first use a soft-bristled toothbrush dipped in a little stain remover to gently descale, and then use a soft brush to brush a waterproof agent in the gap, which can not only prevent seepage, but also prevent mold growth.

Related questions
1 answers2024-09-18

Generally, it is simulated with a tiled material, if you want to make a model, draw a plane, calculate the number of segments, and then convert it into polygons, select faces, and chamfer.

7 answers2024-09-18

Buying finished products, it is very complicated to do it yourself, now carpenters will only do straight ones, you kind of chair legs with bent legs, carpenters will not necessarily do it, the finished products are processed by machines, because of the large output, so the price is low.

3 answers2024-09-18

Ceiling, generally 2 categories, living room, room class ,,, kitchen toilet class ,,, normal situation, kitchen toilet must be ceiling, will not save this, kitchen toilet ceiling is very cheap, about 15 a square meter (the price is a little high), package installation... Living room, high quality of life can be hanging,,, is some tricks, to put it bluntly, it is good-looking ,,, room is generally not suspended, is to go the corner line, also cheap, about 12 a meter, package installation Ha,, also,,, room ceiling, generally have central air conditioning,,, look at your personal ,,, like hanging, do not like to hang ,,, living room ceiling, buy their own materials, find workers to get not expensive, about more than 30 manual bar, it seems to be,

4 answers2024-09-18

You can chisel along the side seam of the tile with a cone or chisel and then pour water on it, the next day you will find that the tile is a little loose, and then pry it off, I used to do this, of course, you can also find a cement worker, about 200 fast on it.

2 answers2024-09-18

Go to the decoration market to buy waterproof coatings, generally Yuhong's brand is good, after buying back, AB group, stir together, brush with a brush, generally on the barrel has instructions. It is best to use adhesive for wall tiles, about 20 yuan a pack, add water and mix thoroughly, wipe on the back of the bricks, and paste it on the wall, but it generally needs to be cut, so it is best to ask the master to paste it, and you can't do it yourself.