The room is divided into bathrooms

Updated on Bathroom 2024-09-14
3 answers
  1. Anonymous users2024-01-24

    You can try to use the whole bathroom, and then add a layer of gypsum board to the whole bathroom, which is light in weight, simple, fast and convenient to install, and the quality of industrial products is guaranteed.

  2. Anonymous users2024-01-23

    Light steel keel composite plastic buckle plate, the lightest, the structure is safe without accounting. This method is lighter than the Taber board, and the polystyrene foam board is not heavy, but the Taber board is a little heavier after being double-floured.

  3. Anonymous users2024-01-22

    1.The foundation can be padded with red bricks 120mm high, and then made of light steel keel waterproof gypsum board facing wall.

    2.The department uses block lightweight bricks, combined with glass or glass brick materials, and the light is transparent. Low load-bearing.

Related questions
2 answers2024-09-14

It's better not to live. Because formaldehyde and benzene in paint are transmitted through the air, these are carcinogenic and harmful to the human body. This is the reason why the new house has to be ventilated for 3 months after renovation.

2 answers2024-09-14

No problem, you can put the head of the bed on the north side.

1 answers2024-09-14

Move the bed to a different position, not under the beam, and install a red curtain in the bathroom.

3 answers2024-09-14

It is best to carefully analyze the load-bearing strength of the partition wall!

2 answers2024-09-14

It is estimated that the waterproofing of the bathroom is not done, and the water seeps into the wall, so you can only wait for the wall and the ground to be completely dry, and re-do the waterproofing in the bathroom, and the waterproof layer should extend from the ground to the wall, 250MM higher than the ground, and the height of the waterproof layer of the bathroom by the shower head wall shall not be less than 1800MM; THE WATERPROOF LAYER OF THE COATING FILM IS EVENLY BRUSHED, THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, THE WATERPROOF SURFACE OF THE COATING FILM IS NOT BLISTERED, NOT FLOWING, SMOOTH AND CONCAVE, AND IT IS BEST TO DO A 24-HOUR WATER STORAGE TEST AFTER THE WATER IS DONE TO CHECK THE INTEGRITY OF THE WATERPROOF LAYER. After confirming that there is no problem, rebuild the wall and floor.