Build a house in the countryside, contract labor and materials, calculate the money by the square, a

Updated on Balcony 2024-09-16
1 answers
  1. Anonymous users2024-01-24

    The first floor can only be counted as a usable area, and the second floor balcony cannot be counted as the first floor.

Related questions
1 answers2024-09-16

That depends on the price of materials in a region, in Henan. >>>More

7 answers2024-09-16

The price of ceiling packaging materials varies according to different regions and the choice of different materials. Generally speaking, the price of ceiling contractors is between 100-300 yuan square meters. >>>More

2 answers2024-09-16

Loss should be added, but the loss has a degree. The highest reasonable calculation method is: (room length, single top piece side length) (room width, single top piece side length) = billable area. >>>More

1 answers2024-09-16

The roof steel tile drip eaves groove belongs to the exterior wall decoration, this can not simply say that the contract foreman requirements are reasonable and unreasonable, if you can't talk about it, the general eaves groove is a finished product, many manufacturers on the market are also including installation, you can compare the price. >>>More

1 answers2024-09-16

The wardrobe is still an aluminum alloy wardrobe, the production cycle is short, the price is reasonable, and the aluminum alloy wardrobe has no formaldehyde, but also moisture-proof and mothproof, the key is that the surface of the wardrobe is a wood grain surface, which looks the same as a wooden wardrobe.