    Plugging leaks seems simple. In fact, it is not as simple as ordinary people think. Each leak has some peculiarities.

    Therefore, if you want to deal with it thoroughly, you have to go to the scene to observe and understand before you can make a preliminary plan, so that sometimes there will be some leakage points that are not in place. Secondary treatment is required to achieve satisfactory results. It is recommended that you find a local professional plugging personnel to carry out the construction.

    If there is no such company in the local area. We can handle it for you. Although it is a bit more expensive, it can solve the problem completely at once.

    It's not that we don't tell you the construction method, because people who haven't dealt with such problems are not good at it. It will only help. We are now in Baotou and are helping a friend with a similar problem like yours.

    They are professional in waterproofing, but not in plugging leaks. It costs a lot of money not only to not deal with it well, but also to increase the difficulty and cost of post-processing. If you need help, please add your friend Hi to talk.

  2. Anonymous users2024-01-23

    Do you have a bathtub in your home? There is a possibility that the bathtub may seep down after it is full. It is recommended to empty for a short time! Don't take the water from the bathtub either.

  3. Anonymous users2024-01-22

    There is water in the floor, and after a long time it is gone.

  4. Anonymous users2024-01-21

    Where is the dripping water downstairs? Is there a floor drain? Consider the joint between the floor drain and the ground. Redo the waterproofing with a professional waterproofing company.

Related questions
3 answers2024-09-12

Don't think that the developer has done the so-called building waterproofing, and just release water when the renovation is waterproofing, and when the water leaks, you will regret it. If the bathroom you use is a shower, then the height of the waterproof layer on the wall next to the shower head in the bathroom shall not be less than 1800MM, and you can do it well. And after the waterproofing project is completed, it is necessary to do a 24-hour water storage experiment, and other walls can be selected according to the budget, but at least 30mm to 50mm high. >>>More

2 answers2024-09-12

The room can be pasted imitation wood grain floor tiles to look good, it is recommended to paste polished tiles in the hall, the biggest feature of polished tiles is that the whole body is made of the same material, hard and wear-resistant. Therefore, the high degree of friction is conducive to anti-slip and is a good choice. And it also has other advantages, the product structure is dense, no deformation, no discoloration, anti-fouling and easy to clean. >>>More

5 answers2024-09-12

To create a warm and comfortable kitchen, it is not only visually clean and refreshing, but also convenient, practical and scientific. So what color should be pasted in the kitchen to look good? The following information can provide reference value. >>>More

2 answers2024-09-12

Oxalic acid, but oxalic acid will not be good for the bottom plate, if the floor of your home is high-end, it is recommended that you use something else.

5 answers2024-09-12

There are 2 answers to this question: 1. The water that leaked from your house before is still left in the concrete pouring floor slab, because the water in the concrete pouring floor slab takes a long time to complete, but it will basically not be there in ten days. 2. It is the water droplets produced by the steam in the bath downstairs when it meets the cold floor slab. >>>More