-
Squared. Bathrooms and kitchens are more expensive.
-
Calculated on a per-square meter basis.
See if there is a bathroom in the room, and if there is, it will be easier to decorate. If you don't have to redesign a bathroom, the project is relatively large, and you have to re-groove the sewer pipes.
1. Don't use it all. Do a good job of waterproofing, make a stone threshold stone, and waste all the pads!
If anything, the floor tile factory would have been closed long ago!
Bathroom floor tiles are generally constructed by dry paving. Dry-mix mortar is laid on the base layer first, and then cement mortar is applied on the back of the brick for paving.
Be sure to hang the ceiling before installing the cabinets. The range hood you mentioned has a smoke pipe, and now the general hood has a retractable cover. The height of the kitchen is 2400mm, and the pipe hood can basically reach the ceiling.