The toilet at home should be waterproof, the floor and walls are tiled, and I saw on the Internet th

Updated on Toilets 2024-09-01
2 answers
  1. Anonymous users2024-01-24

    Unreliable waterproof layer, it's best to smash the ground to do these nanometers, effective in a short period of time, and after a long time, it will have no effect.

  2. Anonymous users2024-01-23

    Summary. Because it is a nano-level material, it can highly penetrate into the building materials and have a physical and chemical adsorption effect with the building materials, which can not only prevent water, beverages and other moisture from entering the building materials, but also do not affect the air permeability of the building materials.

    The toilet at home should be waterproofed, the ground and walls are tiles, and I saw on the Internet that there is a nano-permeable waterproofing agent, saying that it is no need to plane and smash, and it is applied to the tile floor.

    Pro, there is a nano-permeable waterproofing agent.

    Nano penetrating waterproofing agent is a colorless and transparent silicone water-based water-based waterproofing agent. It is very environmentally friendly wild skin, the structure is stable, non-toxic, harmless, non-polluting, is a green waterproof material limb ridge annihilation.

    Moreover, it is easy to use and not complicated to operate, but the waterproof effect is very good, and it can be guaranteed to be effective for a long time.

    Because it is a nano-level material, it can highly penetrate into the building materials and have a physical and chemical adsorption effect with the building materials, which can not only prevent the water and beverages from entering the building materials, but also do not affect the air permeability of the building materials.

    It can be directly sprayed and painted on building materials, such as slate, cement surface, etc. These materials have the characteristics of micro-cracking and staring rock, and can play a moisture-proof and waterproof effect after spraying nano-penetrating waterproofing agent.

Related questions
1 answers2024-09-01

There are no waterproof requirements for the kitchen and balcony in the building, but considering the relationship between the upstairs and the downstairs, it is recommended to do it slightly.

9 answers2024-09-01

1. Kitchen water, mainly when cooking, the water in the basin splashes on the wall or spills on the ground, sometimes it may be to wipe the ground when the ground is wet, which is the main source of kitchen water, but basically the water will be eliminated by evaporation, but there will still be a small part of the water seeping into the wall and the ground through the gap between the tiles. Floors and walls that have not been waterproofed for a long time will be more damp compared to other walls. Therefore, both the kitchen and the balcony need to be waterproofed. >>>More

5 answers2024-09-01

I've been sitting on the renovation for 20 years, and I haven't heard of seepage! In fact, it is what we often call waterproofing. Many of the original buildings of the bathroom in the new building itself are waterproofed, but because they are worried that they are not very good, the general customer still has to do waterproofing during the renovation period. >>>More

2 answers2024-09-01

This resolutely does not work, you must wait for the waterproof layer to completely dry, and then carry out a closed water test to ensure that there is no leakage, before you can start tiling, and in the process of tiling, you must ensure that there is no damage to the waterproof layer. The so-called closed water test refers to the toilet waterproof layer is completed and dry, the floor drain on the bathroom floor, the nozzle and other drainable pipes are sealed with tape to ensure that there will be no water leakage, and the water surface of the bathroom begins to release water, the height of the control principle is that the water surface must be higher than the upper mouth surface of the floor drain and must ensure that the floor of the bathroom can be immersed in water, so that you can see whether there is a leakage problem in the bathroom downstairs, and the water storage time is at least 24 hours or more.

1 answers2024-09-01

The most feasible is to use bricks to make a general frame, and then use cement plastering and then waterproof treatment Others can also use light steel keel skeleton cement pressure plate cover But there are not necessarily bricks to make the shape flexible Recommended: Now there is a "soft tile", which is said to be very suitable for all aspects of pasting. Fumei soft tiles. >>>More