The process flow of toilet waterproofing project

Updated on Bathroom 2024-09-30
1 answers
  1. Anonymous users2024-01-24

    Base treatment, cleaning, leveling layer, bonding layer, detail additional layer, acrylic waterproof layer, water storage test, protective layer construction, secondary water storage test.

    1.The elevation of the kitchen and bathroom should be checked correctly, and special attention should be paid to the correct elevation position of the floor drain. 2.The quality of the wall hole at the root of the floor drain and pipeline should be carefully inspected, the wall hole should be dense and qualified, and the root of the pipeline must be caulked according to the requirements during the construction of the leveling layer.

    3.The yin and yang angles should be made into an arc, straight and flat. 4.

    Screed construction: If there are voids, cracks, and unequal defects on the base surface, repair and smooth them with cement mortar. The base surface must be firm, flat, clean, free of dust, greasy, wax, release agent, etc., and other debris substances.

    5.The construction of the waterproof layer can only be carried out after the screed is dry, and the construction should be fireproof and waterproof during the construction. Construction workers should wear soft-soled shoes.

    6.After the waterproofing layer is completed, the finished product should be protected, and the businessman must not move around. After the inspection is confirmed, the concealed project acceptance visa can be applied for, and the next process construction can be carried out.

    7.After the waterproof construction is completed, the water storage test is carried out, and no leakage is considered qualified after more than 24 hours. After the installation of the equipment is completed, the secondary water storage test is carried out.

Related questions
1 answers2024-09-30

How to choose a wall-hung boiler.

One. I choose the power. >>>More

3 answers2024-09-30

Of course, you can, generally do another layer of waterproofing on it, and then close the water for 48 hours to see if there is leakage downstairs, and you can put tiles if there is no leakage.

3 answers2024-09-30

Grassroots treatment and cleanup.

Do the screed. Binding layer. >>>More

3 answers2024-09-30

These are all single decoration projects, do not belong to the waterproof project with special agreement, the waterproof project with special agreement is generally waterproof on the building structure itself, whether it is the exterior wall, or the roof, and the bathroom are waterproof on the building structure itself, as for the single decoration project has the waterproof requirements of each individual project.

2 answers2024-09-30

When buying a house, it is said that the waterproof should be guaranteed for five years, especially the waterproof of the bathroom. But after handing over the house, the owner decorates it himself, and the property company will not take care of it, because you have renovated it and moved the roof and ground. However, it is best to do waterproofing again when decorating, just in case, to increase the waterproof function. >>>More