What to do if the ceiling is leaking in the bathroom?

Updated on Bathroom 2024-09-11
2 answers
  1. Anonymous users2024-01-24

    When your home is renovated, the bathroom may not have been waterproofed, there are 3 ways to solve it:

    One is to re-do the waterproofing, but to knock out the floor tiles;

    The second is to do high-pressure grouting from downstairs to the top in the leaking gap, and ask a professional construction unit to do it, so that the loss is minimal, but it needs to be cooperated downstairs;

    The third is to buy a shower room, the kind with a base, then there will be no water leakage.

  2. Anonymous users2024-01-23

    Contact the upstairs homeowner and the property management company first, and go to the upstairs homeowner to check the situation on the spot.

    First of all, close the water valve as much as possible to avoid further leakage. Check the leakage points one by one, you can first put the gap between the heating pipe and the casing, the sewer pipe, the floor drain, and the root of the wall are all easy to leak locations, and in the case of cleaning and drying, evenly apply glass glue to seal it. Then use a seam or waterproof glue to coat and seal the gaps between the tiles.

    Do not use water for 24 hours. Test the water after 24 hours. Secondly, you can drill multiple small holes at the water seepage on the top surface of your home according to different positions, and then use a syringe to drive the waterproof paint into the holes.

    The expansion of the waterproof coating blocks the internal gaps, and then achieves the effect of waterproofing. This is a simple grouting waterproofing treatment. After the above treatment, the general leakage situation can be solved.

    How to deal with toilet leakage and how to repair it.

    1. If the upper and lower pipes are broken, the pipes should be replaced.

    2. If there is water seepage on the ground, please follow the steps below to fix the toilet leak.

    1. Clean dust, oil stains and stagnant water on the surface, and keep the surface dry.

    2. If the tile joints are filled with caulk, you need to use a knife to cut a small groove.

    3. Spray penetrating waterproofing agent on the surface of the tile, tile joints, wall joints and pipe roots, and ensure uniform spraying.

    4. After the waterproofing agent is 90% dry (about 2 hours later), fill all tile joints and damaged parts with seam sealant.

    5. After waterproof construction, the construction site shall not be wet with water within 24 hours.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose.

    Villa Master.

Related questions
8 answers2024-09-11

(1) The first situation may be because the waterproof layer of the upstairs bathroom and kitchen is not done well. In this case, first communicate with the upstairs residents and do a 24-hour waterproof test: fill the waterproof place with water, test it to see if the water will leak downward, if there is leakage, you need to knock off the floor tiles and redo the waterproofing. >>>More

2 answers2024-09-11

If it doesn't work, sue to settle it.

10 answers2024-09-11

The toilet ceiling is leaking, and when it is serious, it is like rain.

1 answers2024-09-11

Due to the long period of use, there was a gap between the sewer PVC pipe and the cement board, which had nothing to do with the waterproofing at that time. Solution: Dig a groove between the sewer pipe and the cement slab, and then do waterproofing, wait for the waterproof to dry, and then pour cement to grind it flat, and pave the ground on the ground.

14 answers2024-09-11

It was the same in our family a few years ago.

It is caused by the lack of waterproofing upstairs, and it is necessary to coordinate with the residents upstairs to solve it. >>>More